background image

Maintenance

For your safety and environmental protection:
Have repairs of electrical parts and refrigeration circuit
only carried out by a qualified technician!

2 - 8 days after installation

V - belts

check tension

tighten

Every  3 - 6  months

When machine is subject to heavy strain, in case of poor water quality or for hygienic reasons: at less frequent intervals

Water supply

Strainer / Filter

clean

water chamber incl valve

clean

Condenser

use soft brush or compressed air to

clean

water-cooled machine

open condenser and use pipe brush 

clean pipes

check seals

replace, if necessary

Compressor

oil level in sight glass

check

refrigerant oil  (consult ZIEGRA)

refill, if necessary

V - belts

check

replace, if necessary

A loose V-belt does not transfers the 
load correctly on the auger. This will
overload the freezing unit.

Ice hose

and water retainer calcified?

clean - or replace

Gearbox

ATM  NRV 90

Lifetime lubrication with synthetic oil  1 Litre

check oil level

or Flender  OT 80

Lifetime lubrication with synthetic oil  1,5 Litre

detach drive-shaft cover

BP Energol SGXP 220         

drain oil into fuel measure

Mobil Glygoyle  30

and refill up to the correct

Shell Tivela WB (SC 320 )

level.

Klüber Syntheso D 220 EP
or equivalent

Freezing unit

see  cleaning of freezing unit

page 8

Bearing

check, replace if necessary

The following are symptoms 
of a defective bearing:
*

Water leaks from bottom of freezing unit

*

Noise during operation

*

Overload cut out has switched off

Placement and insulation 

check, renew insulation

of sensor expansion valve

4

Содержание UBE 1.500

Страница 1: ...e quality Miscellaneous 7 Cleaning of freezing unit 8 Wiring diagram attached Cooling circuit General installation advice Assembly Instruction Freezing Unit Spare parts list Subject to technical modif...

Страница 2: ...tating auger does not form part of the refrigeration circuit Therefore leakages in the refrigeration system caused by rotating parts cannot occur The ideal ice temperature is 0 5 C ZIEGRA Chip ice has...

Страница 3: ...the machine Tighten all electrical connections in the control and at water temperatures above 15 C resp 25 C panel as they may have loosened during the production capacity may decrease transport Cran...

Страница 4: ...s full This light barrier has been chosen by us for these 10 Phase sequence Relay particular conditions Please contact us The phase sequence relay switches off the machine if the phases are not connec...

Страница 5: ...if necessary V belts check replace if necessary A loose V belt does not transfers the load correctly on the auger This will overload the freezing unit Ice hose and water retainer calcified clean or re...

Страница 6: ...eck connection and fuses Fuses blow up Check Intermittent contact Check electrical connections also in control panel Water pressurestat or readjust or replace Water level control defective readjust or...

Страница 7: ...cooled machine insufficient water pressure increase water pressure to min 2 bar condenser soiled clean condenser with bottle brush hot water and antilime agent clean water filter water or condensing p...

Страница 8: ...ust evaporation temperature as indicated Check thermal feeler pipe and contact at evaporator outlet insufficient amount of refrigerant remove leak evacuate circuit refill bubbles in sight glass with i...

Страница 9: ...unit into a container o Connect a hose of appr 80 cm with funnel at the water inlet of the freezing unit o Mix cleaning agent with hot water For each freezing unit 1 2 bottle agent in 1 litre water o...

Отзывы: