Chapter 1, INSTALLATION
40
If a fuel pipe inside the building is more than 90 cm
long, you must use an extra cut-off valve.
The external fuel tank must be placed at least 2 metres
away from any heat source.
The external fuel tank must have a filling opening on
the top and a ventilation opening with a weather-
resistant cap on the side. Some tanks use the same
opening for ventilation and filling.
Important: Ensure that the fuel pipe is free of dust and
waste particles. These particles may cause problems in
the fuel receptacle.
Copper tubing with an exterior diameter of 3/8” must
be used for the fuel pipe.
The external tank and the installation of the external
tank must meet fire applicable (local) regulations. Refer
to the local authorities for these regulations.
Installation may be done by a qualified person only.
Fig.1-11 Connection to the fuel pipe
Laser 95
Fire safety valve
(recommended)
Fuel drainage
container with
unlocking button
Valve (recommended)
2.5 m (max.)
40 cm (min.)
Fuel tank placed
outside
Fuel filter: Preferred type
– water intake cut-off
valve
Valve
Loop
Copper tube with
3/8 exterior
diameter
Содержание Laser FF 95
Страница 1: ...Laser FF 95 3 26 49 MANUEL D UTILISATION OPERATING INSTRUCTIONS GEBRUIKSAANWIJZING 3 4 1...
Страница 32: ...Chapter 1 INSTALLATION 33 Discharge chute 1 Right angled air hose 2 Flexible air hose 1 Hose clip 2...
Страница 55: ...Hoofdstuk 1 INSTALLATIE 56 Uitlooptrechter 1 Haakse luchtslang 2 Flexi luchtslang 1 Slangklem 2...