Zeus Appollo Z21 Series Скачать руководство пользователя страница 6

Grade

   

Description

  

A

       

O

.

D

.

  

B

       

  

C

       

Bare Wire Length

Conductor Material
Sectional Area

Value

10~12mm

2

20~25mm

10mm around

08

07

Figure

 

4.2-3

The installation instruction of SUNCLIX please refer to Figure 4.2-2.

Installation instruction of MC4 and H4 please refer to Figure 4.2-3.

Negative 

plug

Positive 

plug

Figure

 

4.2-2

Figure

 

4.3-1

A

B

C

Compress by professional tool

Inverter

 

side

4.3 Battery Connection

Before connecting to a battery, please install a separate DC breaker (120A) between the inverter and the battery. This will ensure the 

inverter can be securely disconnected during maintenance. 

● 

Be aware of electric shock and chemical hazards!

● 

It is a normal phenomenon that an electric arc occurs when connecting a battery to the inverter without the use of a DC breaker.

● 

It's very important for system safety and efficient operation to use an appropriate cable for the battery connection. To reduce the 

risk of injury, please use the correct recommended cable size. Refer to Figure 4.3-1.

● 

● 

Suggestion: The  battery  should  be  installed  with  the  correct  distance  between  each  battery  unit,  for  details  please  refer  to  the 

battery manufacturer's user manual.

● 

The number of battery cells used will be determined by the customer depending on the required capacity, however the choice will 

be limited to a total series voltage array of 48 V.

Please follow the steps below to implement battery connection: 

(

1

)

 Check the nominal voltage of batteries. The nominal output voltage should meet Zeus Appollo Solar product Spec.

(

2

)

 Disconnect DC breaker between the inverter and the battery.

(

3

)

 Disconnect the screw cap from the insulator.

(

4

)

 Disconnect the waterproof ring from the insulator.

(

5

)

  Put  the  cable  through  the  components  in  this  order:  screw  cap,  waterproof  ring,  insulator,  battery  cover  and  battery  terminal. 

Refer to Figure 4.3-2.

(

6

)

 Compress the terminal head using an appropriate tool and screw down the screw cap slightly. Refer to Figure 4.3-3, Figure 4.3-4.

(

7

)

 Insert the battery terminals into the corresponding apertures and fasten them with a screwdriver and a spanner, then fasten the 

battery cover with the pan head screws provided in the accessory bag.  Refer to Figure 4.3-5, Figure 4.3-6, Figure 4.3-7.

(

8

)

 Screw down the screw cap again.

(

9

)

 An earth wire terminal is set on the left side of the inverter. If necessary, it can be connected to earth wire. Refer to Figure

 

4

.

3

-

8

Suggestion: If the battery is to be installed internally, please refer to the battery manufacturer's user manual.

Positive 

plug

N

egative 

plug

Inverter

 

side

7mm

7mm

2

2

.

5

~

4mm

2

2

.

5

~

4mm

Figure

 

4.3-3

Crimp

Cable

Figure

 

4.3-2

Waterproof

 

ring

Battery

 

cover

Battery

 

terminal

Screw

 

cap

Insulator

SUNCLIX

 

Series

Figure

 

4.2-1

There are two types of DC plugs, SUNCLIX and MC4 or H4 series. Please refer to Figure 4.2-1.

●  

permanently damage the inverter.

·

● 

Check the short-circuit current of the PV string. The total short-circuit current must not exceed the inverter’s maximum PV current. 

·

● 

T

he

 

PV array should not be connected to the grounding conductor.

·

● 

Please use the PV plugs provided in the accessory bag.

·

● 

The minimum insulation resistance to the ground of the PV panels

 

must

 

exceed 19.33k

Ω

, There is a risk of electrical shock if

the total minimum resistance requirement is not met.

Before  connecting  the  PV  panels,  ensure  the  plug  connectors  have  the  correct  polarity.  Incorrect  polarity  could 

4.2 PV Connection 

● 

Reversed

 

polarity

 

will

 

damage

 

the

 

inverter

!

 or H4

 

Series

M C4

Содержание Z21 Series

Страница 1: ...Ltd Brisbane Office 32 Cr Banyo QLD 4014 ockford Street Phone 07 31236148 Fax 07 32664758 Email salesstaff zeusappollosolar com au Perth Office 1 87 President Street Welshpool WA 6106 Phone 08 655565...

Страница 2: ...Selecting The Mounting Location 3 4 Mounting 03 03 04 05 16 01 17 18 19 21 4 1 AC Output Connection 4 2 PV Connection 4 3 Battery Connection 4 4 RS 485 Connection 4 5 EzMeter Connection 4 6 EzConverte...

Страница 3: ...d over or slung 2 2 Safety Installation maintenance and connection of inverters must be performed by qualified personnel in compliance with local electrical standards wiring rules and the requirements...

Страница 4: ...nection Guide 1 Wi Fi Connection Configuration Warranty card 1 Instruction of Fast Installation 3 3 Selecting The Mounting Location For the accessibility of monitoring the LED lights and possible main...

Страница 5: ...C terminal Refer to Figure 4 1 2 7 Compress the terminal head using an appropriate tool and screw down the screw cap slightly Refer to Figure 4 1 3 Figure 4 1 4 8 Insert AC terminals into the correspo...

Страница 6: ...ator 4 Disconnect the waterproof ring from the insulator 5 Put the cable through the components in this order screw cap waterproof ring insulator battery cover and battery terminal Refer to Figure 4 3...

Страница 7: ...Positive terminal Negative terminal Figure 4 3 6 Figure 4 3 7 Hexagon head screw Pan head screw 4 5 EzMeter Connection The EzMeter may detect the current magnitude and direction to control the working...

Страница 8: ...It will be required to configure the EzConverter if a lithium battery is used in the system to enable communication with the battery BMS Communication between the inverter and the EzConverter is via a...

Страница 9: ...igure 4 8 1 Open USB cover Touch switch 4 10 System Connection Diagram Note Not all overcurrent protection devices are included in diagram this diagram is for Australia Switch Board Grid Back Up Zeus...

Страница 10: ...NECTED NOT ACTIVE ON GRID IS ACTIVE AND CONNECTED BLINK GRID IS ACTIVE BUT NOT CONNECTED OFF GRID IS NOT ACTIVE ON CONSUMING ENERGY FROM GRID BUYING BLINK 1 SUPPLYING ENERGY TO GRID ZEROING BLINK 2 SU...

Страница 11: ...Relay Check Failure DC Injection High EEPROM R W Failure SPI Failure DC Bus High AC HCT Failure GFCI Failure Vac Failure Battery Over Temperature Battery Under Temperature Battery Cell Voltage Differ...

Страница 12: ...efficiency Euro efficiency MPPT adaptation efficiency Max inverter backfeed current to the array A IEC62109 1 2 AS3100 IEC62040 1 30 28 516 440 184mm 516 440 184mm Protection Residual current monitori...

Страница 13: ...e ambient air temperature is 20 50 C relative humidity range is 4 to 100 applied to PD3 Indoor unconditioned the ambient air temperature is 20 50 C relative humidity range is 5 to 95 applied to PD3 In...

Отзывы: