Zeus Appollo Z21 Series Скачать руководство пользователя страница 11

17

18

7. Working Modes

The Z21 series inverters have the following main operating modes providing for different conditions:

Mode1

Energy  produced  by  the  PV  system  is  first  used  for  the 

local  load,  the  excess  energy  is  then  used  for  charging 

batteries, and then finally feeding into the grid.

Mode2

If there are no PV panels, battery energy is used for the 

local load first, the grid also can supply power when the 

battery capacity is insufficient.

Mode3

If the grid is faulty or there is no grid, the system can still 

operate,  PV  panels  and  batteries  supply  energy  for  the 

local  load.  There  is  a  BACKUP  port  on  the  inverter  for 

emergency power supply.

Mode4

The  battery  can  be  charged  by  the  grid,  charging  time 

and power can be set up adaptably.

An error message will be displayed on the APP if a fault occurs.

Table 8-1 is

 

the

 

Description of Error Message

Error message

Utility Loss

Fac Failure

PV Over Voltage

Over Temperature

Isolation Failure

Ground I Failure

Relay-Check Failure

DC Injection High

EEPROM R/W Failure

SPI Failure

DC Bus High

AC HCT Failure

GFCI Failure

Vac  Failure

Battery Over Temperature

Battery Under Temperature

Battery Cell Voltage Differences

Battery Over Total Voltage

Battery Discharge Over Current

Battery Charge Over Current

Battery Under SOC

Battery Under Total Voltage

Battery Communication Fail

Battery Output Short

Description

Grid disconnected

Grid frequency no longer within permissible range

Overvoltage at DC input

Over temperature on the case

Ground insulation impedance is too low

Too high ground leakage current 

Relay self-checking failure

Too high DC injection 

Memory chip failure

Internal communication failure

Too high BUS voltage

Output current sensor failure

Detection circuit of ground leakage current failure

Grid voltage no longer within permissible range

Battery Over Temperature

Battery Under Temperature

Li-Ion Battery Cell Voltage Differences

Li-Ion Battery Over Total Voltage

Battery Discharge Over Current

Battery Charge Over Current

Battery Capacity Low

Battery Under Total Voltage

Battery Communication Fail

Battery Output Short

8 Error Messages 

Table 8-1

Содержание Z21 Series

Страница 1: ...Ltd Brisbane Office 32 Cr Banyo QLD 4014 ockford Street Phone 07 31236148 Fax 07 32664758 Email salesstaff zeusappollosolar com au Perth Office 1 87 President Street Welshpool WA 6106 Phone 08 655565...

Страница 2: ...Selecting The Mounting Location 3 4 Mounting 03 03 04 05 16 01 17 18 19 21 4 1 AC Output Connection 4 2 PV Connection 4 3 Battery Connection 4 4 RS 485 Connection 4 5 EzMeter Connection 4 6 EzConverte...

Страница 3: ...d over or slung 2 2 Safety Installation maintenance and connection of inverters must be performed by qualified personnel in compliance with local electrical standards wiring rules and the requirements...

Страница 4: ...nection Guide 1 Wi Fi Connection Configuration Warranty card 1 Instruction of Fast Installation 3 3 Selecting The Mounting Location For the accessibility of monitoring the LED lights and possible main...

Страница 5: ...C terminal Refer to Figure 4 1 2 7 Compress the terminal head using an appropriate tool and screw down the screw cap slightly Refer to Figure 4 1 3 Figure 4 1 4 8 Insert AC terminals into the correspo...

Страница 6: ...ator 4 Disconnect the waterproof ring from the insulator 5 Put the cable through the components in this order screw cap waterproof ring insulator battery cover and battery terminal Refer to Figure 4 3...

Страница 7: ...Positive terminal Negative terminal Figure 4 3 6 Figure 4 3 7 Hexagon head screw Pan head screw 4 5 EzMeter Connection The EzMeter may detect the current magnitude and direction to control the working...

Страница 8: ...It will be required to configure the EzConverter if a lithium battery is used in the system to enable communication with the battery BMS Communication between the inverter and the EzConverter is via a...

Страница 9: ...igure 4 8 1 Open USB cover Touch switch 4 10 System Connection Diagram Note Not all overcurrent protection devices are included in diagram this diagram is for Australia Switch Board Grid Back Up Zeus...

Страница 10: ...NECTED NOT ACTIVE ON GRID IS ACTIVE AND CONNECTED BLINK GRID IS ACTIVE BUT NOT CONNECTED OFF GRID IS NOT ACTIVE ON CONSUMING ENERGY FROM GRID BUYING BLINK 1 SUPPLYING ENERGY TO GRID ZEROING BLINK 2 SU...

Страница 11: ...Relay Check Failure DC Injection High EEPROM R W Failure SPI Failure DC Bus High AC HCT Failure GFCI Failure Vac Failure Battery Over Temperature Battery Under Temperature Battery Cell Voltage Differ...

Страница 12: ...efficiency Euro efficiency MPPT adaptation efficiency Max inverter backfeed current to the array A IEC62109 1 2 AS3100 IEC62040 1 30 28 516 440 184mm 516 440 184mm Protection Residual current monitori...

Страница 13: ...e ambient air temperature is 20 50 C relative humidity range is 4 to 100 applied to PD3 Indoor unconditioned the ambient air temperature is 20 50 C relative humidity range is 5 to 95 applied to PD3 In...

Отзывы: