Zeus Appollo Z21 Series Скачать руководство пользователя страница 5

05

06

Grade

   

Description

  

A

       

O

.

D

.

  

B

       

  

C

       

Bare Wire Length

Figure

 

4.1-1

A

B

C

A

B

C

4 Electrical Connection

4.1 AC Output Connection 

Conductor Material
Sectional Area

Value

11~12mm

2

6mm

10mm around

Before connecting to the grid and the load, please install a separate AC breaker  (250VAC/30A) between the inverter and 
the grid. This will ensure the inverter can be securely disconnected during maintenance. 

It's very important for system safety and efficient operation to use appropriate cable for the AC connection. To reduce risk 

of injury, please use the suitable recommended cable size. Refer to Figure 4.1-1. 

Please adhere to the following steps when making an AC connection:

(

1

)

  Check  the  grid  voltage  and  frequency  at  the  connection  point  of  the  inverter.  It  should  meet  the  Zeus Appollo  Solar  products' 

specification.

(

2

)

 Measure the impedance between neutral cable and earth cable, make sure it does not exceed 10 ohms.

(

3

)

 Disconnect AC breaker between the inverter and the Grid.

(

4

)

 Disconnect the screw cap from the insulator.

(

5

)

 Disconnect waterproof ring from insulator.

(

6

)

 Feed the cable through the components in this order: screw cap,waterproof ring, insulator, AC cover and AC terminal. 

      Refer to Figure 4.1-2.

(

7

)

 Compress the terminal head using an appropriate tool and screw down the screw cap slightly. Refer to Figure 4.1-3, Figure 4.1-4.

(

8

)

 Insert AC terminals into the corresponding holes and fasten them by a screwdriver 

(

Suggestion: diameter

 

of

 

the cutter bar is

 

4mm, 

torsion:8~12Kg-f.cm),  then  fasten  the AC  cover  with  pan  head  screws  in  the  accessory  bag.  Refer  to  Figure  4.1-5,  Figure  4.1-6, 

Figure 4.1-7.

(

9

)

 Screw down the screw cap again.

Figure

 

4

.

1

-

2

Figure

 

4

.

1

-

3

Cable

Waterproof

 

ring

AC

 

cover

AC

 

terminal

Screw

 

cap

Insulator

Crimp

Figure

 

4

.

1

-

4

Cable

 

core

 

section

 

after

 

crimp

Figure

 

4

.

1

-

7

Figure

 

4

.

1

-

5

L

----

line

  

N

----

neutral

  

PE

----

earth

back

-

up

 

terminal

grid

 

terminal

Figure

 

4

.

1

-

6

Figure

 

3.4-3

Figure

 

3.4-4

a

detail

 

a

detail

 

b

Figure

 

3.4-1

Figure

 

3.4-2

457mm

229mm

117mm

105mm

400mm

Remember that this inverter is heavy! Please be careful when removing from the packaging.

1. Use the wall-mounted bracket as a template and drill 6 holes on the wall, 10mm in diameter and 80mm deep. 

Refer to Figure 3.4-1.

2. Fix the wall-mounted bracket on the wall with six expansion bolts in the accessory bag.

3. Carry the inverter by holding the heat-sink two sides. Refer to Figure 3.4-2. 

4. Place the inverter on the wall-mounted bracket. Refer to Figure 3.4-3,

 

Figure 3.4-4.

3.4 Mounting

b

Pan

 

head

 

screw

AC

 

t

erminal

 

s

hould

 

b

e

 

c

lamped

 

p

roperly, 

this

 

is

 

very

 

important

Содержание Z21 Series

Страница 1: ...Ltd Brisbane Office 32 Cr Banyo QLD 4014 ockford Street Phone 07 31236148 Fax 07 32664758 Email salesstaff zeusappollosolar com au Perth Office 1 87 President Street Welshpool WA 6106 Phone 08 655565...

Страница 2: ...Selecting The Mounting Location 3 4 Mounting 03 03 04 05 16 01 17 18 19 21 4 1 AC Output Connection 4 2 PV Connection 4 3 Battery Connection 4 4 RS 485 Connection 4 5 EzMeter Connection 4 6 EzConverte...

Страница 3: ...d over or slung 2 2 Safety Installation maintenance and connection of inverters must be performed by qualified personnel in compliance with local electrical standards wiring rules and the requirements...

Страница 4: ...nection Guide 1 Wi Fi Connection Configuration Warranty card 1 Instruction of Fast Installation 3 3 Selecting The Mounting Location For the accessibility of monitoring the LED lights and possible main...

Страница 5: ...C terminal Refer to Figure 4 1 2 7 Compress the terminal head using an appropriate tool and screw down the screw cap slightly Refer to Figure 4 1 3 Figure 4 1 4 8 Insert AC terminals into the correspo...

Страница 6: ...ator 4 Disconnect the waterproof ring from the insulator 5 Put the cable through the components in this order screw cap waterproof ring insulator battery cover and battery terminal Refer to Figure 4 3...

Страница 7: ...Positive terminal Negative terminal Figure 4 3 6 Figure 4 3 7 Hexagon head screw Pan head screw 4 5 EzMeter Connection The EzMeter may detect the current magnitude and direction to control the working...

Страница 8: ...It will be required to configure the EzConverter if a lithium battery is used in the system to enable communication with the battery BMS Communication between the inverter and the EzConverter is via a...

Страница 9: ...igure 4 8 1 Open USB cover Touch switch 4 10 System Connection Diagram Note Not all overcurrent protection devices are included in diagram this diagram is for Australia Switch Board Grid Back Up Zeus...

Страница 10: ...NECTED NOT ACTIVE ON GRID IS ACTIVE AND CONNECTED BLINK GRID IS ACTIVE BUT NOT CONNECTED OFF GRID IS NOT ACTIVE ON CONSUMING ENERGY FROM GRID BUYING BLINK 1 SUPPLYING ENERGY TO GRID ZEROING BLINK 2 SU...

Страница 11: ...Relay Check Failure DC Injection High EEPROM R W Failure SPI Failure DC Bus High AC HCT Failure GFCI Failure Vac Failure Battery Over Temperature Battery Under Temperature Battery Cell Voltage Differ...

Страница 12: ...efficiency Euro efficiency MPPT adaptation efficiency Max inverter backfeed current to the array A IEC62109 1 2 AS3100 IEC62040 1 30 28 516 440 184mm 516 440 184mm Protection Residual current monitori...

Страница 13: ...e ambient air temperature is 20 50 C relative humidity range is 4 to 100 applied to PD3 Indoor unconditioned the ambient air temperature is 20 50 C relative humidity range is 5 to 95 applied to PD3 In...

Отзывы: