PREMIER M PLUS INSTALLATION MANUAL
Approved Document No: GLT.MAN-111
PAGE
19
Issue : 2.8 Author: NJ Date: 23/07/2012
12.5 POWER SUPPLY CONNECTIONS
CONNECTION NO
DESCRIPTION
USE
1
EXT PSU IP
External Power input from Switch Mode cage
2
FAULT OP
Volt free fault relay, normally energised
3
A-FUSE
Fuse for the first 24V output
4
24V A
Connection for the first 24 V output
5
24V B
Connection for the second 24 V output
6
B-FUSE
Fuse for the second 24V output
7
BATTERY
Battery connection. 2 x 12V SLA batteries wired in series
8
FACTORY ADJUST
Charger adjust pot. DO NOT ADJUST
9
THERM
Battery charger temperature compensation thermistor
10
EARTH ISOLATE
Jumper link to enable / disable earth fault reporting
11
SEL. BATTERY
Link to put charger in calibration mode from power up.
12
CN2/CN3
ISP programming connector
12.6 POWER SUPPLY FUSES
FUSE NO
DESCRIPTION
RATING
IN LINK WIRE
Battery Fuse
5.0A time delay 5 x 20mm glass
FS1
Supply Fuse A
2.5A time delay 5 x 20mm glass
FS2
Supply Fuse B
2.5A time delay 5 x 20mm glass