background image

The ZetaBeam

1

 Distance and position guidelines

These guidelines are recommendations only and it is important that you refer 
to your appropriate governing standards at all times.

When positioning your ZetaBeam there are important factors that you should consider, mainly what 
distance you are covering and the optimal position in the building.

What distance?

The standard ZetaBeam is suitable for distances of 

7m to 70m

 to the reflector. If you require 

70m to 

140m

 you will need to use the 

. For ranges of 

140m to 160m

 you will 

require the 

.

Note. 

for distances 

under 20m

 use the short range mask supplied on the single reflector.

7 to 70 metres the standard ZetaBeam

The standard ZetaBeam comes boxed with the head unit, low level controller

key and quick start installation guide, this should be used for distances over 7m and up to 70m.

70 to 140 metres - the standard Ze mid range 70 to 140m kit

For distances of 70 to 140 metres you will need to use the standard 
ZetaBeam and a 

mid range extension kit

 (the mid range kit comes with 

from the standard kit to the mid range kit with the screws provided).

140 to 160 metres - the standard Ze long 
range 140 to 160m kit

For distances of 140 to 160 metres you will need to use the standard 
ZetaBeam and a 

long range extension kit

 (the long range kit comes 

provided).

Standard ZetaBeam covers 7m and up to 70m

Содержание Zeta Beam

Страница 1: ...The ZetaBeam Protection System Xtra User Guide 0150 01...

Страница 2: ...rt range mask supplied on the single reflector 7 to 70 metres the standard ZetaBeam The standard ZetaBeam comes boxed with the head unit low level controller key and quick start installation guide thi...

Страница 3: ...t along its entire axis Note Careful design consideration should be made when positioning beams and reflectors in environments that can be susceptible to condensation i e warehouses near to water that...

Страница 4: ...ction is not made ERROR will appear on the controller this connection can be checked by reading the resistance across the black and grey terminals they will read 110 ohm if OK or 220 ohm if not connec...

Страница 5: ...To re panel To controller EOL FIRE Fire LED Auxiliary no relay contact 2A 30Vdc used for External LED switching no c nc no c nc fault fire controller interface external reset fire technical support 44...

Страница 6: ...ne beam To controller Beams 1 2 3 To controller To re panel no c nc no c nc fault fire controller interface external reset fire technical support 44 0 1582 608000 manufactured by Lemtronics Sdn Bhd Ph...

Страница 7: ...raw it may be necessary to use normal mode to prevent excessive current draw Fast mode allows x4 times faster motor response and it may be quicker to commission each beam in turn Once commissioning is...

Страница 8: ...ill assume it has found the far wall You will need to identify and move the obstruction or reconsider the positioning of the ZetaBeam You can identify that the beam is obstructed by the right hand fig...

Страница 9: ...the angle of the beam Y until you receive an AQ of over 100 Re ector is lower than the beam head use Y to bring the beam onto the re ector Beam head Re ector y x x y Manual AQ 125 X 0 000 Y 0 000 Manu...

Страница 10: ...and would normally be below 0 90 If this is not the case you may need to start the Manual Alignment process again to return both the zetabeam axis to 0 00 and identify and remove the obstruction Air Q...

Страница 11: ...ding the resistance across the black and grey terminals if connected it should read 110ohms if not connected at one end this will read 220ohms This screen will appear when the beam is performing a sel...

Страница 12: ...o return signal is received the beam will reach full power and the screen will say Pre Align complete If you don t receive high enough output power and receiver sensitivity readings this will usually...

Страница 13: ...uto reset The beam is factory set to auto reset when the received signal raises above the fire threshold hysteresis This can be set to latching if your system requires this Change by using the right a...

Страница 14: ...before it returns to normal This action prevents small fluctuations in returned signal causing the beam to fall in and out of a fire state This can be adjusted between 1 and 40 by using the right and...

Страница 15: ...g needs to be maintained in the beam path use the right and left keys to turn the system on and off This will show as a fault on the panel Press enter to return to beam maintenance 5 Press enter to go...

Страница 16: ...s Electrical Specifications Supply Voltage 12 to 30 VDC Supply Current 3 5mA constant current in all operational states Constant Current 17mA constant current in fast commissioning Environmental Speci...

Отзывы: