18
6. Set up
English
SE1
(1)
SE2
SE3
SE4
SE5
■
HT2200
1. Join the engine unit to the clutch housing of the
cutter unit, with the fuel tank on the blade side.
2. Align the mounting holes and tighten the engine
securely with the 3 screws.
3. Remove the right handle mounting screw, nut, and
washer casually attached on the blade beam.
4. Set the right handle on the beam making the grip
come to the opposite side of the cutting teeth, and
attach with the hardware removed before. When
fastening the nut, hold the screw to keep the blade
washer loose.
(1) BLADE WASHER (Keep Loose)
• To assure designed cutting performance, always
keep a half spare turn for the blade screws. Over
tightening will cause blade seizure and premature
wear of the clutch system. Too loose screws will
make the gap between the blades large, and result
in poor cutting performance.
5. Install the left handle to the bracket attached to the
clutch housing. Use the hardware as shown below.
(SE3)
(1) Bolt
(2) Plate
(3) Nut
(4) Bracket
6. Cover the throttle cable with corrugate tube. Connect
the throttle cable and the switch wire. Hold the wires
at the lower part of the handle using the tie band.
(SE4)
(1) Corrugate tube (2) Tie band
(3) Throttle cable
(4)Throttle lever
7. Check the cable play and, if necessary, adjust
between .04” and .08” by bending throttle wire
receiver of the bracket with needle nose pliers.
NOTE
Содержание CHT2200
Страница 44: ...44 11 Parts list Fig 1 CUTTER GROUP HT2200...
Страница 46: ...46 11 Parts list Fig 2 ENGINE GROUP HT2200...
Страница 48: ...48 11 Parts list Fig 3 CUTTER GROUP CHT2200...
Страница 50: ...50 11 Parts list Fig 4 ENGINE GROUP CHT2200...
Страница 55: ......
Страница 56: ...KOMATSU ZENOAH AMERICA INC 4344 Shackleford Road Suite 500 Norcross Georgia 30093...