
Page 18 of 20
801525NZ - Chilled HydroTap Installation Instructions - Aug 2015 - v2.00
Commissioning
4.3
-
Flow Calibration
1.
Press the [Start] button and the tank will first
empty then fill. This will take aprox 5 minutes.
2.
Upon completion the actual pulse will be
displayed.
3.
Press [Next] for the Boiling Calibration screen.