Ventilation
2.1
All Models
Proper air circulation must be provided for all Chilled models. The system will operate correctly only if the
recommended air gaps are achieved during Installation. It is recommended to install vent duct and louvre
panels for under floor and /or door vent systems.
**Note:
Inlet and outlet vents should be separated by a Min 100mm, to avoid hot air recirculation.
IMPORTANT:
See page 13 for clearances.
When installing air flow ducts, the following tools will be required:
•
Jigsaw and 12mm drill.
•
Keyhole or Wall Board saw.
Recommended Installation showing the correct air flow
**MIN.
100mm
Warm Air OUT
via kickboard louvre
MIN.
35mm
Cool Air IN
via cabinet
floor, front
vent grille