42
5.3
Commissioning and turnover protocol
Customer data
Last Name:
First Name:
Tel.:
Street:
City / State:
Zip code:
Construction project:
Unit type:
Serial no.:
Year of construction:
Completeness
No. Components
Description
Result
1
Supply air duct (if accessible)
Installed as planned
Cleaning instructions provided
Yes / No / N/A
Yes / No / N/A
2
Supply air vents
Installed as planned
Design as planned
Cleaning instructions provided
Yes / No / N/A
Yes / No / N/A
Yes / No / N/A
3
Overflow air vents
Installed as planned
Design as planned
Yes / No / N/A
Yes / No / N/A
4
Exhaust air vents
Installed as planned
Cleaning instructions provided
Yes / No / N/A
Yes / No / N/A
5
Exhaust air duct (if accessible)
Cleaning instructions provided
Yes / No / N/A
6
Extractor fan
Cleaning instructions provided
Yes / No / N/A
7
Control system
Operational
Yes / No / N/A
8
Filter, optional
Replacement or Cleaning instructions
provided
Yes / No / N/A
9
Heat exchanger for waste heat recovery
Cleaning instructions provided
Yes / No / N/A
10 Documentation material
Available
Yes / No / N/A
Function
1
Operational with rated ventilation, as planned
Result OK
Action required
Yes / No / N/A
Yes / No / N/A
2
Switching speeds/modes possible, as planned
Result OK
Action required
Yes / No / N/A
Yes / No / N/A
3
Electrical power consumption
Result OK
Action required
Yes / No / N/A
Yes / No / N/A
Note of confirmation
Date:___________________
Signature / Stamp: _____________________________________________________________________
Commissioning personnel / installation technician
APPENDICES