manualshive.com logo in svg
background image

GB

B

Instruction Manual 

1.

 

Description and range of application

Fully  automatic  condensate  removal  pump  designed to remove condensate from furnace burners, gas 
or  oil  condensing  boilers,  air  conditioners,  refrigeration  display  cabinets  and  de-humidifiers where 
drainage by gravity is not possible.  

 WARNING:  Regulations  of  water  authorities  or  other  relevant  authorities  must be 
obeyed  when  condensate  is  being  disposed  of.  Condensate  from  condensing 

boilers  being  operated  with  standard  heating-oil  (not  low  on  sulphur)  may  not  be 

disposed  of  into  the  canalization  without  being  neutralized.  This  is  also  true  for  condensing 
boiler systems exceeding 200 KW. 
2.

 

Technical Data

Motor power output: P2 = 80 Watt 
Voltage: 230 V – 50 Hz

 

Nominal current: 0,6 A

 

Operational 

voltage: 230 V – 50 Hz

 

Protection: IP 

44

 

RPM: 2780

 

Max. flow: 360 l/h

 

Max. head: 5,2 m WS

 

Max. liquid temperature: 50° C

 

3/8“ connection with 9 mm hose connector

 

Weight: app. 2,5 kg

 

Cable with plug: Length 2,0 m

 

3.

 

Scope of delivery 

Ready  to  plug  in  pump  with  2  metre  power  cable  and  signalling  cable,  inlet  adapter,  check  valve  and 
instruction manual. The Neotech 360 – 6MT version also comes with discharge tubing (6m) which is to 
be connected to the outlet side (check valve) which is supplied.   

4.

 

Installation and start up

 WARNING: Read instructions completely prior to installing, operating or servicing the 

pump! The installation may only be performed by a qualified person. 

Check  content  for  completeness  and  eventual  damage  prior  to  operation.  Inform  your  dealer 
immediately in case of any deficiency.  

 Never  transport  or  remove  the  pump  from  the  packaging  by  holding  on  to  the 
cable! 

An  orderly  grounded  mains  supply  and  residual  current  circuit-breaker  of  max. 
30mA disconnecting all phases is required for the operation of the pump.  
Already existing  outlets  are  to  be  checked  for  the  existence  of  a  residual  current 
circuit-breaker.  Ensure  that  power  cord  is  NOT  plugged  in  when  performing  any 
type of work on the pump.  

4.1 Installation and inlet connection 

The pump must be level (either on the floor or mounted on the wall) to ensure a proper operation. 

 The  pump  must  be  installed  ensuring  that  it  can  not  tilt  and  that  it  is  properly 
mounted!  

The  pump  should  be  mounted  close  to  the  condensate  drainage  of  the  unit  to  be  drained.  The 
connections  from  the  unit  to  the  pump  are  not  included.  Please  ensure to use corrosion-resistant and 
acid-resistant material when choosing the drainage pipes (e.g. PVC, PE, stainless-steel).  

 Condensate from condensing boilers is very aggressive and corrosive! 

A standard high-temperature plastic wastewater tube (40mm) may directly be connected to one of the 

three  inlets by means of the supplied inlet adapter (see figure 2). Other pipes or tubing with a smaller 

diameter  may  be  safely  fixed  by  running  cable  straps  through  the  two  holes  in  the  adapter  and  firmly 
tightening them.

 

Figure 1 - Inlet 

adapter

 

Figure 2: Inserted inlet adapter

 

Figure 3

 

Under no circumstances may pipes or tubes be inserted into the tank because this 
may lead to pump failure since the integrated float switch may be blocked! Standard 
condensing boilers are equipped with a siphon trap. This must in all cases 

be filled with water

 

prior to operation of the boiler and condensate pump. Failure to do so 

may result in acidic gases reaching the pump and therefore destroying it! 

Содержание ZKH 15

Страница 1: ...Kondensathebeanlage Condensate pump ZKH 15 Betriebsanleitung Operating Instructions GB D Zehnder Pumpen GmbH Zw nitzer Stra e 19 08344 Gr nhain Beierfeld Deutschland www zehnder pumpen de...

Страница 2: ...d evtl Transportsch den zu pr fen Bei M ngeln informieren Sie bitte umgehend Ihren Fachh ndler Die Pumpe niemals am Kabel aus der Verpackung ziehen und transportieren F r den Betrieb der Pumpe ist ein...

Страница 3: ...tung angeschlossen wird ACHTUNG Bei Nichtbeachtung besteht im Falle eines R ckstaus aus der Kanalisation berflutungsgefahr der Kellerr ume 4 3 Signalkabel Die Pumpe ist neben dem Netzkabel POWER mit e...

Страница 4: ...uf den Tank aufgesetzt werden Dieses rastet h rbar ein Nun sollte die Anlage 2 3 mal mit sauberem Wasser gesp lt werden Nach dem Einstecken des Netzsteckers wird ber eine der Einlauf ffnungen Wasser e...

Страница 5: ...w hrleistung ausgenommen sind Sch den die auf unsachgem em Gebrauch oder auf Verschlei beruhen Folgesch den die durch Ausfall der Anlage auftreten werden von uns nicht bernommen Sollte ein Gew hrleist...

Страница 6: ...r remove the pump from the packaging by holding on to the cable An orderly grounded mains supply and residual current circuit breaker of max 30mA disconnecting all phases is required for the operation...

Страница 7: ...stem for the connection as an alarm 4 4 Testing WARNING Pull out the tab before testing or operating see figure6 The operation of the pump can be tested by activating the test switch without filling t...

Страница 8: ...efore servicing or performing pump maintenance 7 Warranty The warranty period for this product is 24 months from date of purchase Proof of purchase must be provided Any material or manufacturing defec...

Отзывы: