
2. Device Installation
7
C h a p t e r 2
Device Installation
Unpack the unit and verify shipment content with the packing list :
•
One GS8 equipment.
•
One power adapter and one power cable.
•
One Ethernet cable.
•
One copy of quick start guide.
•
One copy of e-manual.
•
One Zed-3 pen as a gift.
•
Accessories package: six M6 screws, eight M4 screws, two GS8 fixers.
Note:
If there is any missing or damage, contact the seller or Zed-3 sales immediately and save
all packages for the repackaging if need.
2.1
Installation Requirements
2.1.1
Power Requirements
•
Power-off before installation, dismantlement or movement.
•
The electric outlet shall be installed near the equitment and shall be easily accessible in case
of emergency.
2.1.2
Anti-static Requirements
•
If the device's power line connects to external cable, take necessary anti-static actions please.
•
Anti-static Requirements
-
Static will damage the circuit or the whole machine seriously if static exceed the limitation,
so make sure the ground bus well enough.