7.2.11 Install the Mouthpiece onto the mouthtube on the Body. Install and tighten the plastic Tie (24) that
came in the Service Kit. Cut off any excess tab sticking out of the Tie with side cutting pliers.
(See Photo 48)
8.0.0 TESTING THE OCTO-Z AFTER REBUILDING
After completed the bi-annual overhaul of the Octo-Z, the testing needed is the same as that performed dur-
ing the Visual Inspection procedure. Go to line 5.0.1 on page 7 of this manual, to read these steps.
9.0 TROUBLESHOOTING
Photo 48
33
Inlet filter clogged.
Replace the 1st stage’s filter.
Air supply to 1st stage insufficient.
Verify the supply air pressure. Make sure
the customer had the air valve turned all
the way on during the dive.
1st or 2nd stage improperly adjusted. Refer to sections 4.5 and 5.5 of this manual.
A. HIGH INHALATION EFFORT AT SURFACE (cracking effort in air):
POSSIBLE CAUSE
RECOMMENDED ACTION