Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
16/44
2.1.
Checks before installation
Checking the outer packaging
Packaging materials and components may be damaged during transport. Therefore, it is recommended
to check the materials of the outer packaging before installing the charging station. Check the surface of
the box for external damage such as holes or tears. If any type of damage is detected, do not open the
box containing the charging station and contact the supplier and the courier as soon as possible.
It is also recommended that you check the contents of the packaging and make sure that they
correspond to what was declared. If not, contact your dealer to have any missing parts sent to you.
Checking the product
After removing the charging station from its packaging, check that the product is intact and complete. If
any damage is found or components are missing, contact the supplier and transport company.
Contents of the packaging
No.
Part
Qty
1
Charging station
1
2
Screw with built-in washer
4
3
Front opening keys
2
4
RFID activation card
2