![Zass ZPAC 09 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/zass/zpac-09/zpac-09_operating-instructions-manual_3180802007.webp)
7
3.11. Timing
• When it is not in cooling, strong cooling, ventilation, heating or dehumidification mode:
a). Press [mode] key to select function, then press [Timing] to confirm
b). Press [+] and [-] to select the start time, and then press [Timing] to confirm.
c). Press [+] and [-] again to select the end time, and then press [Timing] to confirm.
At the end of timing setting, there shall be a voice prompt.
• When it is in cooling, strong cooling, ventilation, heating or dehumidification mode:
a). Press [+] and [-] to select the end time, and then press [Timing] to confirm.
b). Press [Timing] to confirm.
At the end of timing setting, there shall be a voice prompt.
3.12. Child Lock
• Child lock setting: Press [+] and [-] at the same time to enter child lock status, when it is in child lock,
other keys will be locked and can not be operated.
• Release of child lock: Press the [+] and [-] keys at the same time again or unplug the power plug to
release the child lock status.
3.13. Condensation Removal
After the completion of cold storage or heat storage, if there is no other operation, the condensation
removal function will start automatically without any other operation.
3.14. Drainage
In case of full water alarm and need to drain to the working water level or drain the water in the water tank,
please follow the steps below to drain the water in the internal water tank of the machine.
• Unscrew the drain knob on the rear plate, tighten one end of the water inlet / drain pipe to the drain, and
connect the other end to the drain such as the water collecting container or floor drain.
• Insert the power plug into the power socket and press the on key on the control panel.
• Press the [drainage] key, and press the drainage key for more than 3 seconds according to the voice
prompt, and the system will automatically start the water pump for drainage.
• When the water level is above the working water level, the drainage will stop only when it reaches the
working water level. If it is necessary to drain the water in the water tank, repeat step (3) to continue the
drainage until it is drained.
• After the completion of drainage, the drainage pump will automatically shut down.
• Remove the water inlet / drain pipe and screw the drain knob cover.
English
4. APP USE
4.1. Download APP
Please download Tuya APP from the Internet.
4.2. Register
• Click “create new account” to enter the registration page
• The system will automatically determine the current country / region. You can also select the country /
region manually, enter the mobile phone number or email, and click next
• If you fill in the mobile number, fill in the verification code received by the mobile phone, enter the
password, and click “OK” to register successfully
• If you fill in the email address, enter the password on the page and click “OK” to register successfully.
4.3. Log in / Retrieve Password A Password login
If you have already registered your APP account, click “log in with existing account” to enter the login page.
• The system will automatically judge the current country / region, or you can select a country / region
manually
• Enter your registered mobile number or email, enter your password and log in to the system.
Содержание ZPAC 09
Страница 27: ...NOTES NOTI E JEGYZETEK 27...