2.9.3 Unit Start-up
Before starting up the unit, a certain number of verifications must be
on the
installation to ensure that the unit will operate under the best possible conditions.
The check list below is not exhaustive and should only be used as a minimum reference
basis:
①
.Make sure fan rotates freely.
②
.Inspect all water piping for flow direction.
③
.Verify all system piping is correct for operation as per installation requirement.
④
.Check voltage of the unit power supply and make certain voltage is within authorized
limitations.
⑤
.Make sure the unit is properly grounded.
⑥
.Check the presence of protective and breaking devices.
⑦
.Check all electric connections for tightness.
⑧
.Check all piping for leaks and air is well ventilated.
perfor
med
After ensuring all electric connections confirm to the local regulations, follow the
Operation Instructions to start-up the unit.
After start-up the unit, if there is
abnormal sound, please shut off the power supply
immediately to ensure the safety of the unit.
an
2.9.2
Pre Start-up
2. Installation
Содержание SLIM-C Series
Страница 2: ......
Страница 34: ...31 5 Appendix 5 1 Exploded view...
Страница 36: ...33 5 2 Wiring diagram 5 Appendix...
Страница 38: ...NOTES...
Страница 39: ......
Страница 40: ...www ZAN TIA com...