background image

10 

 

5. 

INSTALLATION AND WORKING 

 

5.1 

MOVING AND POSITIONING 

 

 

As first operation, once unpacked the corker, assemble the handle A securing it on the 
top of the fixed frame D, using the two screws provided with handle, inside the box. 

 

Moving happens in sure way appealing the corking machine through the handle A
Once  arranged    the  corking  machine  on  a  flat  surface,  you  will  proceed  to  eventual  leveling  of  the 
frame by adjusting the feet I

 

5.2 

PREPARATION 

 

5.2.1  Mobile head F regulation 
 
Regulate  the  mobile  head  F  in  the  appropriated  position  to  second  to  the  height  of  bottle, 
leaving trough the top of bottle and bell one space of 2/4 cm approximately. 
For  make  this,  unscrew  partially  the  knob  T  and  S  and  then  move  the  head  F  up  or  down 
depending on the requirement, insure that the pins places  on the head F goes perfectly  on the  
holes for insertion B. Therefore  proceed to block the knob T and S

 

5.2.2  Bottle holder L regulation 

 

Once regulated the height of the head, proceed to center the bottle, in case the neck of bottle 

was not perfectly aligned with the corking head M

For  make  this,  unscrew  partially    the  knob  R  and  then  regulate  the  bottle  holder  L  loosening 

before the nut G. 

Once centered the bottle, block all with the knob R. 

 

 

 

5.2.3  Choosing of the bell M 

 

Use the most suitable bell (Ø 26/29/31 mm) depending on the chosen cap for capping. 
The replacement happens unscrewing the bell from the corking head and screwing that one in 

substitution. 

 
 
 

 
 
 
 
 
 
 
 
 
5.3 

COMPRESSED AIR CONNECTION 

 

Regulate  the  gauge  of  compressor,  or  of  corker  (R.P.  version),  to  the  pressure  indicated  on  label  K 
places on the piston Q

connect inlet hose from the compressor to the connection E of the corking machine.

 

at this point try to action the corking machine, pulling at the same time the two levers C and P to 
check the proper functioning.

 

Содержание AIR-MATIC

Страница 1: ...ATIC CROWN CAPS CORKER AIR MATIC User and maintenance booklet Via dell Artigianato 70 36043 Camisano Vicentino VI Italy Tel 0444 719402 Fax 0444 719423 www zambellienotech it E mail info zambellienote...

Страница 2: ...__________________________ 9 4 2 GENERAL RESIDUAL RISKS___________________________________________________ 9 4 3 HAZARDOUS MATERIAL RESIDUES ____________________________________________ 9 5 INSTALLATI...

Страница 3: ...UCTION EVEN PARTIAL IS PROHIBITED TYPE OF DOCUMENT INSTRUCTION MANUAL AND SPARE PARTS FOR THE FOLLOWING MACHINE PNEUMATIC CORKER AIR MATIC EUROPEAN COMMUNITY LEGISLATION Instructions taken from the fo...

Страница 4: ...responsibility declares that the following machine AIR MATIC Type PNEUMATIC CROWN CAPS CORKER Serial number n ________ Year of construction 201__ Complies with Machinery Directive 2006 42 EC NATIONAL...

Страница 5: ...ECH is not responsible for damage caused by using the machine for aims different than those indicated damage caused by unqualified personnel attempting to repair the machine ATTENTION with regards to...

Страница 6: ...h existing norms in particular those related to the health and safety or workers The product warranty lasts 12 months electrical parts are excluded from the warranty All expendable items are also excl...

Страница 7: ...eel 2 1 1 Machine components The corker is made up of the following machine components as indicated to FIG I and FIG II A HANDLE L BOTTLE HOLDER B HOLES FOR ADJUSTMENT M CORKING HEAD C LEFT LEVER N PL...

Страница 8: ...ATION The corker is delivered complety assembled except for the handle A and packed in a carton box 330x330x580 mm Upon delivery check that the machine was not damaged during transportation and that y...

Страница 9: ...for tasks it is not intended for DO NOT tamper with the machine and remove safety protections DO NOT allow use of the corking machine by children unauthorized persons or persons who do not know how to...

Страница 10: ...F goes perfectly on the holes for insertion B Therefore proceed to block the knob T and S 5 2 2 Bottle holder L regulation Once regulated the height of the head proceed to center the bottle in case th...

Страница 11: ...the bottle holder L 3 pull at the same time with both hand the two levers C and P 4 at the end of the corking release the two levers and remove the bottle corked 5 repeat the operation for each bottle...

Страница 12: ...above exonerates the constructor from any and all responsibility in respect to the guarantee NOTE The indicated frequency refers to normal functioning conditions i e it corresponds to foreseen and co...

Страница 13: ...3 2 BELL 26 B 5 WASHER 6x18 3 3 BELL 29 B 6 SCREW 4x30 3 4 MAGNET HOLDER B 7 NUT M4 SELF LOCKING 3 5 MAGNET B 8 SCREW 4x18 3 6 SPRING B 9 SCREW 5x55 4 1 VALVE DX 3 WAYS B 10 NUT M5 SELF LOCKING 4 2 V...

Страница 14: ...14...

Страница 15: ...ropriate Waste Disposal Centers 9 GENERAL SALES CONDITIONS TRANSPORTATION Responsibility of the buyer CLAIMS Claims will not be accepted if more than eight days have passed since receiving the goods a...

Страница 16: ...16...

Отзывы: