ZALMAN LQ1000 Скачать руководство пользователя страница 8

5.1 Adding Coolant

5.2  Coolant Circulation

5. Leakage Inspection and Test Run

(1) Remove the Reservoir Cap by turning counter-clockwise. 
(2) Mix half 125cc of the provided coolant 250cc with 500cc of distilled water in a container.
(3) Secure the Funnel in the Pouring Hole and carefully pour coolant up to the Reservoir

Window’s “High Level” mark.

(1) To provide the necessary power (12V DC) for your Test Run and Leakage Inspection,

please disconnect the PSU’s Main Connector (20P/24P) and 4-Pin CPU ancillary
connector from the motherboard and use the provided Jump Cable to connect the Main
Connector’s (20P/24P) green wire terminal to a black wire ground terminal.

(2) Connect the Display PCB’s 4-Pin power connector and the PSU’s 4-Pin connector.
(3) When power is supplied, the front panel display/gauges will light up red and the Left Door’

Flow Indicator will light up blue with a spinning impeller. 

(4) For discharging of gas and good coolant circulation, turn the Power Supply ON/OFF

approximately 3~7 times at 10 second intervals.

(5) Check for leakage at each inlet/outlet. Leakage can lead to short-circuiting and/or damage

to the motherboard or other components. If leaking is discovered, turn OFF the power,
completely remove any leaked coolant, and reassemble the leaking section. 

(6) Coolant Level will drop when the coolant begins circulating. Please pour additional coolant

up to the Reservoir Window's “High Level” mark.

(7) After degassing is complete, detach the PSU’s power connection.  Use a coin-like object

to secure the Reservoir Cap to prevent leaking.

(8) Lay the LQ1000 on its right side 
(9) Reinstall the Water Block that were removed from the motherboard for degassing.

(10) Connect the PSU’s Main Connector and the CPU 4-Pin Connector to the motherboard.
(11) To prevent coolant leakage the LQ1000 Must be set upright on its feet before proceeding

with the next step (12).

(12) After setting the LQ1000 upright on its feet, remove the Sealing Bolt from the Reservoir

Cap and secure the Sealing Bolt in the adjacent Sealing Bolt Tap Hole.

Note 1) Please prevent coolant spillage by carefully pouring with the provided Funnel. Coolant Level will

drop when the coolant begins circulating. please pour additional coolant up to the “High Leve”
mark.

Note 2) The provided coolant is a concentrated liquid. please dilute the coolant with distilled water in a 1:4

ratio. 

Note 3) Read the warning label on the coolant’s container prior to use.
Note 4) Keep the LQ1000 and its components away from children. 

Note) Cable organization is necessary to prevent interference with tubes when the Left Door.

Reservoir Cap

4-Pin Connector

Power Supply 
4-Pin Connector

Main Connector

Motherboard Power
Connector

Black Wire

Green Wire

Jump Cable

Sealing Bolt Tap Hole

Pouring Hole

High Level

High Level

High Level

Reservoir Window

Funnel

Sealing Bolt

Reservoir Cap

13

14

Содержание LQ1000

Страница 1: ......

Страница 2: ...g the necessary tools Needle Nose Pliers Scissors will ease the installation process Operational Notes 1 Check to see if the DC cables are properly connected before use 2 Avoid inserting any objects i...

Страница 3: ...E1394 Firewire Port x 1 Headphones x 1 MIC x 1 Dimensions L x W x H 125mm X 172mm X 26mm Weight 800g Material Aluminum Alloy Acrylic Coolant Capacity Max 300cc Power Consumption 6W DC 12V Maximum Flow...

Страница 4: ...WB5 5 6 Diagram Part Name Specifications Qty Application L Wrench 3mm 1 Assembly Allen Screw M4 8 4 Outer Chassis Optional Fan Stand Off 4 Optional Fan Install M B Stand Off 12 M B Installation PSU Sc...

Страница 5: ...the FDD Slot require using Fixing Bolts B bolt M3 5 to secure drives 4 2 Pump Bracket Removal To prevent damage to the unit during transport the Pump Bracket is removed Note The Pump Bracket can cause...

Страница 6: ...board s manual before making cable connections Certain motherboards have different configurations for the IEEE1394a USB2 0 and audio connectors from the one shown in the diagram below Please refer to...

Страница 7: ...le forces in the tube by repeatedly opening and closing the side panel Please adjust the Tube length to prevent tension in the Tube 7 If optional VGA Northbridge Water blocks are please repeat the ten...

Страница 8: ...begins circulating Please pour additional coolant up to the Reservoir Window s High Level mark 7 After degassing is complete detach the PSU s power connection Use a coin like object to secure the Rese...

Страница 9: ...the FND Display will flicker If the flickering is observed please check for problems Coolant Flow Rate Gauge Displays the coolant s flow rate in real time Control Knob Controls the Fan Speed and Cool...

Страница 10: ...ra Quiet Operation Improved Power Factor Reduced Harmonics through Active PFC High Efficiency Design and 80 PLUS Certified Supports ATX12V CPU 4 Pin and EPS12V CPU 8 Pin Gold Plated Terminals 16AWG Wi...

Отзывы: