EXISTING MASONRY CHIMNEY 

 

(see illustration #5)

 

NOTE

: A masonry chimney flue may be used to route 

Z-VENT

 if no other appliance vents directly into the same flue without a liner.

 

Prior to beginning the installation, be sure that the existing chimney meets all national and local building codes. The chimney must 

be cleaned, removing all soot, debris and creosote before installing 

Z-VENT.

 

 

1.

 Using the 

JOINT PROCEDURE

,

 

(illustration #1 & images 1, 2 & 3)

 join pipe lengths as they are lowered down the chimney until 

bottom end lines up with opening in chimney. (A rope may be used to facilitate lowering of pipe). 

2. 

Install flashing

 

over last pipe length and attach top support to pipe. Leave 6” (150 mm) of pipe protruding from flashing so that 

rain cap may be installed and to allow for any adjustment to line up base tee properly (

see image 10

). 

3.

 Fasten flashing to chimney top using caulking and/or screws. If the top clay tile is still in place, the corners of the flashing must be 

notched and flashing plate formed down around clay tile. 

4. 

The rain cap may now be installed using the 

JOINT PROCEDURE 

(illustration #1 images 1, 2 & 3)

.  

5. 

Where required a drain tee should be installed to a pipe as per 

JOINT PROCEDURE 

(image 8 & 9)

6. 

The remainder of the horizontal installation to the appliance can be done the same as for side wall venting illustration 2 observing 

rules for 

HORIZONTAL VENTING.  

7.

 Final adjustment may be made to the top support if necessary. 

 

 

IMAGE 10 

Содержание Z-Vent SVE III Series

Страница 1: ...and contract Pipe must be properly supported Proper joint assembly is essential for a safe installation Follow these instructions exactly as written Check severeness of joints upon completion of assem...

Страница 2: ...e more than 3 ft 91 m from any other building opening gas utility meter service regulator or the like 6 Exterior mounted venting systems should be enclosed below the roof line with a chase to limit co...

Страница 3: ...rds termination NOTE Some flue collars may require the use of high temperature silicone sealant to make a positive pressure gas tight seal IMAGES 1 2 3 CLEARANCE TO COMBUSTIBLES SIDE WALL VENTING INST...

Страница 4: ...I III or IV appliances or downwards for Category III or IV appliances not less than 1 4 6 4 mm every 12 inches 305 mm to prevent collection of condensate at any location in the assembly Fasteners must...

Страница 5: ...5 IMAGE 8 IMAGE 9 ILLUSTRATION 2...

Страница 6: ...installed Where the vent passes through the roof a flashing must be used to maintain the required clearances and to protect from the elements The framed opening must be large enough to provide the nec...

Страница 7: ...be used to support the system 1 Install the Guy Band below the Rain Cap using the 10 24 screw and nut provided 2 Attach stainless steel or galvanized cable with a minimum rated capacity of 500lbs to e...

Страница 8: ...last pipe length and attach top support to pipe Leave 6 150 mm of pipe protruding from flashing so that rain cap may be installed and to allow for any adjustment to line up base tee properly see image...

Страница 9: ...s are completed be sure to go over the entire system to make sure all joints are secure and sealed correctly The seams and joints must be checked for tightness prior to using the venting system A qual...

Страница 10: ...XPRESS WARRANTY HAS BEEN MADE OR WILL BE MADE ON BEHALF OF SELLER WITH RESPECT TO THE Z VENT OR THE INSTALLATION OR REPLACEMENT OF THE Z VENT SELLER SHALL NOT BE LIABLE FOR ANY SPECIAL INCIDENTAL INDI...

Отзывы: