VERTICAL VENTING 

 

(see illustrations #3 & 4) 

NOTE

: The vent termination above the roof line shall consist of a continuous section of vent pipe only (without any joints) and must 

be at least 3 ft. (1 m) to a maximum of 6ft. above the roof line and 2 ft. (.61 m) higher than any part of a structure within 10 ft. (3.1 

m). The total vertical distance of the vent system from appliance flue collar to the rain cap termination and the maximum length of 

offsets shall not exceed that specified in the appliance manufacturer’s installation instructions. No continuous vertical run shall be 

longer than sixty feet (18.3 m). All horizontal sections must observe the rules for 

HORIZONTAL VENTING.

   The clearance to 

combustibles inside a chase shall be no less than 4” (100 mm).  

1

. Prior to beginning the installation loosely assemble all parts required to make sure all parts are present. 

2.

 Locate position for venting system and proceed to cut holes for firestop support and firestop spacers. All vertical installations 

require the use of a support. Frame the opening of the floor using lumber, which is dimensionally consistent with the structural 

members. Insert the support from beneath the framed opening and secure with nails or screws as required. 

3.

 Refer to

 JOINT PROCEDURE

 (

illustration #1 & images 1, 2 &3

) before assembling system. 

4

. Install system joining pipe as required up through roof (

illustration

 

#3

). Tighten gear clamp on firestop support to hold vent 

system. NOTE: A firestop must be provided when a vent passes through a combustible floor or ceiling. The opening must be framed 

for the support since the support also serves as a firestop. 

5.

 The roof flashing can now be installed. Where the vent passes through the roof a flashing must be used to maintain the required 

clearances and to protect from the elements. The framed opening must be large enough to provide the necessary clearances to 

combustibles, taking into account the slope of the roof. The flashing can be used on slopes from flat to 6/12 pitch. Install the flashing 

while holding the pipe centered in the opening. Fasten the flashing to the roof under the roofing material upslope from the pipe and 

above the roofing material below the pipe. Seal as required using high temperature silicone. 

6. 

Install Top Support around pipe and against flashing collar and seal using high temperature silicone. (see i

llustration #3, 4, 5 & 6) 

7

. Attach rain cap using. 

JOINT PROCEDURE

 (

illustration #1 & images 1, 2, & 3

8

. The vertical section is connected by an elbow joined to the horizontal run and then through a drain tee (

see page 9 for details

) to 

the appliance. Elbows are joined to pipe using the 

JOINT PROCEDURE

 (see 

illustration #1 & images 1, 2 & 3

). 

NOTE: 

If there is no solid anchor point in the system below the roof (ie Firestop Support etc.) then a Z-Vent Guy Band must be used 

below the roof as follows. (

see illustration #6) 

a.

 

Attach the Guy Band at any point above an elbow or tee in the vertical section within 20 feet of the roof.  

b.

 

Fasten stainless steel or galvanized cable with a minimum capacity of 500 lbs. to each of the four anchor holes. 

c.

 

Anchor the cables to a rigid building member using an appropriate fastening method. 

9.

  

 A drain tee MUST be installed at the bottom of all vertical stacks in a conditioned space for a category IV vent system to collect 

and dispose of any condensate that may occur in the vent system. 

11.

  Any part of a vent system passing through an unconditioned space where freezing may occur shall be installed into a chase 

enclosure. 
 

ABOVE THE ROOF 

 

  

 

Содержание Z-Vent SVE III Series

Страница 1: ...and contract Pipe must be properly supported Proper joint assembly is essential for a safe installation Follow these instructions exactly as written Check severeness of joints upon completion of assem...

Страница 2: ...e more than 3 ft 91 m from any other building opening gas utility meter service regulator or the like 6 Exterior mounted venting systems should be enclosed below the roof line with a chase to limit co...

Страница 3: ...rds termination NOTE Some flue collars may require the use of high temperature silicone sealant to make a positive pressure gas tight seal IMAGES 1 2 3 CLEARANCE TO COMBUSTIBLES SIDE WALL VENTING INST...

Страница 4: ...I III or IV appliances or downwards for Category III or IV appliances not less than 1 4 6 4 mm every 12 inches 305 mm to prevent collection of condensate at any location in the assembly Fasteners must...

Страница 5: ...5 IMAGE 8 IMAGE 9 ILLUSTRATION 2...

Страница 6: ...installed Where the vent passes through the roof a flashing must be used to maintain the required clearances and to protect from the elements The framed opening must be large enough to provide the nec...

Страница 7: ...be used to support the system 1 Install the Guy Band below the Rain Cap using the 10 24 screw and nut provided 2 Attach stainless steel or galvanized cable with a minimum rated capacity of 500lbs to e...

Страница 8: ...last pipe length and attach top support to pipe Leave 6 150 mm of pipe protruding from flashing so that rain cap may be installed and to allow for any adjustment to line up base tee properly see image...

Страница 9: ...s are completed be sure to go over the entire system to make sure all joints are secure and sealed correctly The seams and joints must be checked for tightness prior to using the venting system A qual...

Страница 10: ...XPRESS WARRANTY HAS BEEN MADE OR WILL BE MADE ON BEHALF OF SELLER WITH RESPECT TO THE Z VENT OR THE INSTALLATION OR REPLACEMENT OF THE Z VENT SELLER SHALL NOT BE LIABLE FOR ANY SPECIAL INCIDENTAL INDI...