
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
Page 74
NJEX 7300L ver.09042003
SSSSS
ECTION
ECTION
ECTION
ECTION
ECTION
12:
12:
12:
12:
12: S
S
S
S
S
Y
YY
Y
YSTEM
STEM
STEM
STEM
STEM
M
M
M
M
M
AINTEN
AINTEN
AINTEN
AINTEN
AINTENANCE
ANCE
ANCE
ANCE
ANCE
Conducting a Forward Purge
Figure 228
1. Place the NJEX System in Standby mode by
pressing the Standby key on the N-300 controller.
2. Close valves V8 and V6
3. Open valve V4 until pressure reaches 50-60 psi (3.4-4
Bar) in the expansion tank, then close valve V4.
4. Scroll to the Meter Level display on the N-300
controller
5. Open valve V2 until:
a) Empty is indicated in the Meter Level display
And
b) Gas bubbling in the bulk odorant storage tank
becomes audible.
6. Close valve V17
7. Proceed to the Venting Pressure Gas procedure on
Содержание NJEX 7300L
Страница 1: ...NJEX 7300L L P G O D O R I Z A T I O N S Y S T E M...
Страница 2: ......
Страница 3: ...THE NJEX 7300L INSTRUCTION OPERATING MANUAL Version NJEX7300L 10012003...
Страница 4: ......