YZ Systems, Inc. 3101 Pollok Drive Conroe, Texas USA 77303 P: 936.788.5593 F: 936.788.5720
Page 45
DP-2010 TP ver.10012004
S
ECTION
11: S
YSTEM
T
ROUBLESHOOTING
Mechanical Operation Test:
1.
Set
the mode switches as follows,
figure37:
Positions 1, 2 and 3 on.
Position 4 off.
2.
Set
the time switches to 00 to enter the
diagnostic mode, figure 33. This mode
enables the user to increase the sole-
noid output rate to one pulse every two
seconds.
DPS-2 Test
1.
Set
the mode switches as follows,
figure 39:
Position 1 and 2 on.
Position 3 and 4 off.
2.
Set
the time dials to 00 to enter the
diagnostic mode, figure 40.
3. This mode enables the operator to
determine if the DPS is operating
properly. This is accomplished by
depressing
and
holding
the test
switch. If the DPS is sensing flow in the
pipeline, the green LED should illumi-
nate. If flow is not present, the red LED
should illuminate, figure 41.
LCD Stroke Indicator Test Mode:
1. To test the stroke counter,
set
the mode
switches as follows, refer to figure 42:
Positions 1, 2 and 3 on.
Position 4 off.
2.
Set
the time switches to 00, figure 43.
(CEVQT[
#RRTQXGF
/WVWCN
5[UVGO
/WVWCN
#RRTQXGF
5[UVGO
(CEVQT[
(CEVQT[
5[UVGO
#RRTQXGF
/WVWCN
Z-65 Timer Mode
Troubleshooting Steps
figure 37
figure 38
figure 39
figure 40
figure 42
figure 43
figure 41
Содержание DynaPak DP-2010TP
Страница 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010TP ...
Страница 2: ......
Страница 3: ...DP 2010TP INSTRUCTION OPERATING MANUAL Version 10012004 ...
Страница 4: ......
Страница 65: ......