YZ Systems, Inc. 3101 Pollok Drive Conroe, Texas USA 77303 P: 936.788.5593 F: 936.788.5720
Page 9
DP-2010 TP ver.10012004
S
ECTION
2: S
YSTEM
I
NSTALLATION
Optional DPS-2 Installation:
a. With the low pressure supply valve and the high
pressure supply valve closed, connect the DPS-2
to the orifice connection tubing.
b. Open the equalization valve.
c. Open the low pressure supply valve or the high
pressure supply valve.
IMPORTANT NOTE:
Do not open either the low pressure supply valve
or the high pressure supply valve without ensuring
that the equalization valve is open. Failure to do
so may damage the DPS-2's internal components.
d. Open the other supply valve.
e. Close the equalization valve.
f. Run the free end of the DPS-2 cable through
the cable entry connector located on the upper left
side on the DynaPak 2010 enclosure.
g. Connect the DPS-2 cable as shown in the
diagram.
h. Tighten the cable entry connector, allowing for
enough cable length to open the enclosure.
High Pressure Supply Valve
Orifice Connection
Equalization Valve
Low Pressure Supply Valve
Flow
Low Pressure
High Pressure
(CEVQT[
#RRTQXGF
5[UVGO
/WVWCN
Clear
Black
IMPORTANT NOTE:
For the Z-65 to operate the DP-2010 System, a
minimum pressure differential of 3" of water must
exist between the high pressure and low pressure
ports of the DPS-2.
figure 6
Содержание DynaPak DP-2010TP
Страница 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010TP ...
Страница 2: ......
Страница 3: ...DP 2010TP INSTRUCTION OPERATING MANUAL Version 10012004 ...
Страница 4: ......
Страница 65: ......