background image

DP-2010XHK Version 04142004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

35

Diagram #10:  DuraSite Portable Sample Vessel Instructions

Purpose:  The DuraSite Portable Sample Vessel permits the
user to remove a liquid or gas hydrocarbon sample from a
pipeline or a sampling device.  This is accomplished without
changing the pressure of the product or exposing it to a
contaminant fluid.  If properly used and maintained the
DuraSite will provide many years of safe, accurate and clean
sampling.

Use:  The DuraSite is a very safe device to use.  As with any
equipment dealing with flammable products, it is mandatory
that a good, thorough operator training procedure be
established prior to use.

Typical use of the cylinder would be as follows:

Step 1:  (In The Lab)  Connect a regulated inert gas supply to
the pre-charge valve.  The product valve should be open.  By
carefully controlling the
pre-charge valve and the regulator, the cylinder can be slowly
charged with pre-charge gas (NOTE:  This should be done
slowly to prevent slamming the piston down to the opposite
end).  The pressure on the pre-charge pressure gauge should
be brought to a reading of 10-50 psi above the expected
pressure of the product in the field .  Close the pre-charge valve
and disconnect the gas supply.  Check the pre-charge valve,
relief device, and the pre-charge pressure gauge for leaks.  Any
leaks should be stopped before continuing.  The vessel should
be placed in a padded carrying case and made ready for field
use.
Proceed to 

EITHER Step 2, or Step 3 as

required for your application.

STEP 2: FOR COLLECTION OF SAMPLE VIA SPOT SAMPLE  OR
FROM  COMPOSITE  ACCUMULATOR  VESSEL.

2a:  Connect the product end of the pre-charged sample vessel
to the product supply.
(Sampler product removal valve, or Pipeline sample probe)
NOTE:  the pre-charge pressure gauge reading should be
greater than the product supply pressure reading.  If not,
repeat Step 1 above.

2b:  Once the vessel is connected to the product supply, it is
necessary to vent a small amount of product prior to filling the
vessel.  This assures fresh product and removes any air or gas
when dealing with liquids.  This can be done by loosening the
product purge valve a very small amount until the product is
purged.  After thorough purging, the product purge valve should
be tightened.

2c: The product pressure gauge reading should be 10-50 psi
below the pre-charge pressure gauge reading. By carefully
opening the pre-charge valve, the pressure becomes equal-
ized, then begins to drop below the product pressure.  The pre-
charge valve should be carefully controlled so as to not vent the
pre-charge gas too fast.

2d:  When the cylinder becomes a maximum of 80% full (see
volume indicator), all valves should be closed.  The product
connection is slowly broken in order to vent any trapped product.
After vessel removal, all connections should be checked for
leaks and the pre-charge and product valve ports capped to
prevent leakage.

2e:  Pack the DuraSite in appropriate carrying case to meet
D.O.T. guideline, with D.O.T.
paperwork and transport to lab for analysis.

STEP 3: FOR DIRECT CONNECTION TO
SAMPLER.

3a:  Connect the sampler discharge port to the product inlet port
to the DuraSite using 1/8" stainless steel tubing.

3b:   (Gas sampling)  Connect the pre-charge port to the
DuraSite to the pipeline for pre-charge pressure (Proceed to
step 3d), or configured like the liquid sample application below.
(Step 3c)

3c:  (Light sampling)  Pre-charge the DuraSite as indicated in
Step 1, then install a pressure relief valve to the pre-charge port
and open the pre-charge valve on the DuraSite. (The pressure
relief valve should have a relief pressure setting of
approximately 100 psi above line pressure.)

3d:  Open the product inlet valve of the DuraSite and the purge
valve on the sampler. Next open the purge valve on the product
end of the DuraSite and allow product to purge all lines and
connections out.

3e:  Close purge valves and begin sample cycle.

3f:  At the end of sample cycle, close product inlet valve on the
DuraSite and remove the DuraSite. Pack the DuraSite in
appropriate carrying case to meet D.O.T. guideline, with D.O.T.
paperwork and transport to lab for analysis.

Step 4:  (In The Lab)  Prior to analysis, the product should be
mixed.  This is accomplished simply and efficiently by inverting
the cylinder end-over-end,  causing the mixing ball to fall
through the product.  Approximately 10-12 trips of the mixing ball
through the product assures a homogenous solution.

Step 5:  The regulated pre-charge gas should be reconnected
to the pre-charge side of the cylinder.  The pre-charge gas
supply should remain open during analysis.

Step 6:  Purging a small amount of product from the vessel
removes unmixed product from the tee, relief device, gauge,
etc.  The unit can now be connected to a chromatograph and
the product analyzed.

Step 7:  After analyzing, the remainder of the product should be
dumped and the vessel properly cleaned.  Normal cleaning can
be accomplished by rinsing the product end with a petroleum
solvent and flushing with acetone.  If a more thorough cleaning
is required, the vessel should be disassembled.

WARNING:  A portable sample vessel should never be  filled
to more than 80%.  This allows a 20% pre-charge cushion to
absorb thermal expansion of the product.
Shipping:  Extreme care should be taken when preparing a
vessel for shipment.  Both valves should be capped to prevent
possible leakage.  The vessel should be placed in a
snug-fitting, well-padded and durable case.  All applicable DOT
regulations should be adhered to.

Содержание DynaPak 2010XHK

Страница 1: ...DynaPak2010XHK SystemSupport Manual Version 04142004 ATEX Rev...

Страница 2: ...stocomplywiththewarrantysetforthherein YZ sentireliabilityandthecustomer sexclusiveremedywillbereplacementoftheproduct s or atYZ soption YZ sreasonableefforttomaketheproductmeetthewarrantysetforthhere...

Страница 3: ...present You will need a sample cylinder s during the installation If you have questions concerning installation operation contact your YZ representative or YZ Customer Service at 936 788 5593 This sam...

Страница 4: ...e Entry Fitting Z 65 6 Controller Solenoid Valve Sample Probe Purge Valve Isolation Valve Hot Tap Adapter 3 4 NPT Sample Discharge Tubing Sample Discharge Stroke Adjustment Knob DynaPak 2000 Pump Wiri...

Страница 5: ...in the ability to start up and resume operation C Proportional to flow sampling in this mode of operation the Z 65 counter operates as a dividing counter The Z 65 counter periodically energizes a low...

Страница 6: ...ampler should not be located within the defined meter tube region AGA 3 manual A The number of unobstructed straight pipe diameters upstream see AGA 3 manual B The number of unobstructed straight pipe...

Страница 7: ...solation valve and purge valve are closed g After pipeline pressure has been applied to the sampler check the probe body pipeline connection using a liquid leak detector 5 System Installation Center 1...

Страница 8: ...open Failure to do so may damage the DPS 2 s internal components d Open the other supply valve e Close the equalization valve f Run the free end of the DPS 2 cable through the cable entry connector lo...

Страница 9: ...arranged so that liquid traps are not created 6 2 Variable volume constant pressure cylinder The free floating piston cylinder DuraSite may be installed in a horizontal position on an optional vessel...

Страница 10: ...4 Move all of the mode switches on the Z 65 to their off positions 7 5 Move both timer counter dials to the 0 position 00 minutes 7 6 Move mode switches 1 2 and 3 to the on position The pump will beg...

Страница 11: ...e timer dials on the Z 65 to the sample rate from step 8 1 NOTE The time 18 minutes above corresponds to the dial setting shown for the Z65 model with the timer range setting in the factory position j...

Страница 12: ...8 Press the test button once to initiate the timer sequence 8 3 Adjust the pump volume adjustment knob to the value used in the calculations in step 8 1 Number of turns open on the pump volume knob 3...

Страница 13: ...d the largest pump displacement setting possible NOTE The time 18 minutes above corresponds to the dial setting shown for the Z65 model with the timer range setting in the factory position jumper on t...

Страница 14: ...Press the test button once to initiate the timer sequence NOTE For the Z 65 to operate the DP 2010 System a minimum pressure differential of 3 of water must exist between the high pressure and low pr...

Страница 15: ...lse 10 2 If the input is a dry contact a Terminate the incoming connections to the Z 65 terminal strip see illustration b Turn mode switch 1 to on c Turn mode switch 2 to off d Turn mode switch 3 to o...

Страница 16: ...kes Example 20 pulses turn dials to 20 Press the test button once to load the value into the memory NOTE If the calculated counter setting is less than 1 or greater than 99 the pulses per volume meter...

Страница 17: ...ss steel tubing from the pump body d Screw the stroke adjustment knob all the way down to the 0 cc stroke setting e Unscrew the pump body by hand from the inlet check valve assembly Separation at this...

Страница 18: ...bushing into the bottom of the pump body NOTE Apply a light coat of assembly grease on the plunger shaft prior to installation k Insert all other bushings springs and o rings in their respective seque...

Страница 19: ...ed LED will illuminate if the battery is low NOTE The solenoid must be connected to test the battery condition Battery condition cannot be tested with a volt meter Replacing a Depleted Battery 1 Remov...

Страница 20: ...Location C4 0004 Filter element 1 see diagrams 3 and 4 D3 0002K DP 2000 Severe Service pump seal kit 1 see diagrams 1 and 2 D3 0003 YZ filter regulator repair kit 1 see diagrams 3 and 4 D3 0142 Z 65...

Страница 21: ...lished by depressing and holding the test switch If the DPS is sensing flow in the pipeline the green LED should illuminate If flow is not present the red LED should illuminate 12 3 LCD Stroke Indicat...

Страница 22: ...There are two Z 65 models the Z 65 6 1 and Z 65 6 03 Each Z 65 timer has two ranges for the timer setting dials 1 Z 65 6 1 Range Setting a xx minutes set the configuration jumper to the far left posi...

Страница 23: ...guration jumper to the far left position factory setting b xx minutes set the configuration jumper to the center position Note To obtain maximum battery life choose the longest solenoid stroke rate po...

Страница 24: ...te again This will normally occur very quickly and give the appearance that the green LED blinks on when the pulse input is received and removed 2 Voltage Pulse Input move mode switch 4 to the on posi...

Страница 25: ...DP 2010XHK Version 04142004 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 25 Diagram 1 DP 2000 pump assembled...

Страница 26: ...ody P N B1 0015 Discharge Check Discharge Check Valve Bushing Bushing Sleeve P N C3 0007 Valve Spring P N B1 0013 O Ring 108 P N B1 0014 Spring Retainer P N A6 0028 Seal Bushing Stroke Adjustment P N...

Страница 27: ...DP 2010XHK Version 04142004 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 27 Diagram 3 YZ filter regulator assembled...

Страница 28: ...2 Upper Dart P N A3 0071 Upper Spring P N C3 0010 P N A3 0070 Piston P N A3 0069 Piston Spring Spring Cap P N A3 0068 P N A3 0067 Bonnet Pneumatic Fitting P N A1 0113 P N A8 0016 Adjustment Screw P N...

Страница 29: ...720 29 Diagram 5 YZ DynaPak Hot Tap Probe Assembly DP HT Adapter 3 4 Root Valve By Customer See Detail Below Section View Hot Tap Adapter DP HT Adapter Body O Ring Valve S S Snap Ring Probe Seal 3 4 N...

Страница 30: ...30 Diagram 5 YZ DynaPak Hot Tap Probe Assembly...

Страница 31: ...155 P N C0 0099 P N Varies See Above Pressure Gauge Stainless Steel Set Screw Inlet Rupture Disc 1800 psi P N A3 0083 Rupture Disc Retainer P N A3 0084 YZ Valve Body P N A3 0137 0 1000 PSI LinkPlus Mo...

Страница 32: ...C0 0048 Qty 8 P N A6 0013 P N G2 0002 Cable Assembly 30 Ft Shrink Wrap SS Bolt P N C0 0047 Qty 8 P N H2 0002 Qty 2 Magnet Support Body Diaphragm Body Diaphragm Body P N A9 5003 High Pressure P N A9 50...

Страница 33: ...D3 0142 1 12 2 Fuses Per Kit Ref No Description Part No Qty Z 65 6 Controller Assembly 1 1 Model Z 65 6 1 F2 0001 Model Z 65 6 03 F2 0018 2 Battery Pack E3 2001 1 3 Stroke Counter Assembly G1 0001 1 4...

Страница 34: ...34 Diagram 9 Z 65 Installation Notes Wiring Control Documentation System Installation Notes and Recommendations...

Страница 35: ...der becomes a maximum of 80 full see volume indicator all valves should be closed The product connection is slowly broken in order to vent any trapped product After vessel removal all connections shou...

Страница 36: ...0 P N C6 1603 DS 1000 Gauge P N A3 0083 Rupture Disc P N A3 0084 YZ UniValve P N C6 1001 Pre Charge Head P N A3 0095 Valve Stem Assembly P N A3 0062 Seat Retaining Washer P N A3 0063 Valve Seat P N C6...

Страница 37: ...DP 2010XHK Version 04142004 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 37 Notes...

Отзывы: