8
5.1 DynaPak-2010RX With Slipstream Kit
a. Mount the DP-2010RX with slipstream
kit on a vertical 2" pole.
b. Connect the slipstream adapter to the
pipeline product supply and product
return connections as shown in the
diagram.
c. Connect the actuation gas supply
(75 psi) to the actuation gas connection
located on the left hand side of the
sampler.
d. Connect the sample out connection to
the sample vessel.
e. Before applying pipeline pressure to the
DP-2010RX, ensure that the product supply
valve is closed.**
f. After pipeline pressure has been applied to
the sampler, check the slipstream tubing
connections for leaks.
g. Open the product supply valve.
h. Follow the "Operational Check and Leak
Testing Procedures" detailed in Section 7.
5. System Installation
**CAUTION
Incorrect operation of valves (over tightening) can result in damage to the valve components
(isolation valve bonnet assembly) which might result in the valve stem being screwed out of the
probe body. This of course results in product at pipeline pressure being vented continually
through this port until this section of the pipeline is shut in. Be aware of the following proce-
dures and information.
· DynaPak valves are of soft seat design and
should only be closed or opened with fingers.
No wrenches should ever be used.
· If a valve will not seal off with finger tight
operation the valve should have maintenance
performed to allow proper operation of the valve.
Element
(Optional)
Loop Driver
w/Static Mixer
(Optional)
(By Customer)
*Vessel Tray
Product Supply
Relief Valve
Static Mixing
Loop
Actuation
50-75 psi
(By Customer)
2" Pipestand
(Optional)
Pressure Switch
SPO-12
*Slipstream Adpater
w/Self-Cleaning Screen
Sample Vessel
YZ Durasite
Product Loop Return
Sampled
Product
Solar Panel Option
(Optional)
21 1/8"
10 1/4"
FLOW
1000
500
2000
psi
1500
PreCharge
300
250
2 75
225
80%
175
200
150
Pulse Input Module
Y−Z INDUSTRIES, INC.
BOX 89 0 S NY DE R, TEXAS 79550
P IM-100
Fa cto ry
A ppr oved
Syste m
Mu tu al
FLOW
100
125
75
25
50
0
Product
1000
500
2000
psi
1500
ps
i
19 49
F actory
S ystem
A p pr ov ed
M utual
YZ SYSTEMS, IN C.
3101 POL L OK DRIV E CONRO E, TE XAS 77303
Z -65 C on trolle r
y
P atents 5,1 52, 678; 4 ,53 1,89 5; 4,9 28, 536
Z-65 Controller
Содержание DP-2010RX
Страница 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010RX...
Страница 2: ...DynaPak2010RX SystemSupport Manual Version 06042001 ATEX Rev...
Страница 25: ...26 Diagram 1 DP 2000 pump assembled...
Страница 27: ...28 Diagram 3 YZ filter regulator assembled...
Страница 35: ...36 Notes...