background image

Revised 26/05/10 

 

ALLURE ELECTRONIC Install Ops May2010  

Page 1 of 23 

 

 

 

ALLURE  

GAS OPEN FIRE

 

 

 

 

ELECTRONIC CONTROL INDOOR

 

MODELS 930 and 730

 

Also includes information for the 630 model  

for which production was discontinued in 2010. 

 

MAY 2010 

 

INSTALLATION 

OPERATION, MAINTENANCE & 

WARRANTY INFORMATION 

 

These instructions should be stored in a convenient safe place for ready reference. 

Also available to download online at www.yunca.co.nz   

 

 

 

Содержание 930

Страница 1: ...OR MODELS 930 and 730 Also includes information for the 630 model for which production was discontinued in 2010 MAY 2010 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions shou...

Страница 2: ...ix B SPARE PARTS LIST 20 21 Appendix C WARRANTY 22 Appendix D WARRANTY REGISTRATION 23 INTRODUCTION Welcome and congratulations on purchasing your YUNCA ALLURE INDOOR ELECTRONIC CONTROL flued gas open...

Страница 3: ...ATERIALS NEAR THIS APPLIANCE DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS OPERATIONAL ENSURE THAT HOME VENTILATION SYSTEMS DO NOT AFFECT THE DRAW OR FLAME PATTERN OF THE FIRE ST...

Страница 4: ...0 360 235 590 670 1100 940 200 250 Production of the 630 model was discontinued in 2010 however the installation maintenance and operation information has been retained in this manual for ease of refe...

Страница 5: ...approaches with air venting but both require the use of zero clearance flue kits 1 For dedicated chimney chases NOT open to the roof ceiling cavity The chase must be vented at the bottom near the bas...

Страница 6: ...ble the 150mm 930 model uses 200mm stainless steel FLUE PIPES together ensuring all seams are in line using three monel St Steel rivets or StSt screws positioned equidistant around the flue circumfere...

Страница 7: ...b In the case of a Flat roof i e With a Pitch of less than 30 not less than 1500 mm above the Highest Point of the Roof c In any case the length of the Flue shall be not less than 3 6 metres from the...

Страница 8: ...need to be completed before the heater is finally positioned Fig 2 6mm dia x 50mm Coach Bolts Supplied If the appliance is being attached to a concrete floor dyna bolts should be used if the floor is...

Страница 9: ...the first two threads at the tip of any gas connection All joints should be tested for leaks before operating the fire Gas pressure requirements Correct gas pressure and the use of a properly sized ga...

Страница 10: ...This will expose the control valve so manometer tubes can be attached to the pressure taps as shown below Fig 4 Important Ensure Pressure Tap is tightened and checked for leaks after testing Control...

Страница 11: ...t adjustment will be required during installation Setting Pressures Fig 4 and 5 MAXIMUM PRESSURE The modulator is adjusted by screwing IN Brass Nut 5 to increase the outlet pressure and screwing OUT t...

Страница 12: ...ed you will see where the bottom strip is fitted using two screws 4 TOP LOUVRE 1 Top Slides out for easier access to the top front cowl and flue spigot refer 7 May be left in place if access to the fl...

Страница 13: ...lift out 5 Rear Tray Remove screws from right and left side lift out 6 Burners Lift out 7 Manifold Baffles Lift out left and right baffles SETTING THE FIRE 1 Replace all panels and grate 2 Check for g...

Страница 14: ...als per row layout as shown below from left to right Coals are numbered on the base Bottom Rear Row Bottom Front Row Top Rear Row Top Front Row 930 26 x No1 Coals 26 x No2 Coals 4 rows of 13 730 20 x...

Страница 15: ...No2 Layout shown is for the 930 model using 13 coals per row The 730 model uses 10 coals per row the 630 uses 8 coals per row layout as shown below from left to right Coals are numbered on the base Re...

Страница 16: ...d Control Direct the infra red beam from this hand control to the receiver mounted at the Control front The receiver will light up when receiving a signal from the hand control The hand control operat...

Страница 17: ...is operating when a button is activated Change remote batteries Check mains power is on Ensure beam from the remote Check the fuse in the back of the control Box Remove rear tray to access No spark a...

Страница 18: ...hat the clearances around the appliance match those stated in this manual Flue way blocked Remove blockage Check cowl LPG gas mix incorrect Contact supplier to clean out bottle Flame Height very large...

Страница 19: ...Revised 26 05 10 ALLURE ELECTRONIC Install Ops May2010 Page 19 of 23...

Страница 20: ...M Remote Hand Control 6598N Receiver Control box PCB for SIT845 6598P 845 Sigma Control Valve 6598Q 537 Electronic Flame Control Assembly 6598R Flame Rod 6598S Spark Electrode 6624GO Fan Assembly comp...

Страница 21: ...7 0 8 0 8 0 8 0 8 0 7 0 7 0 6 930 model Natural Main Jets ALL are 1 2mm dia Fascia Panels Should you require replacement fascia panels please also supply the measurements as there have been some desig...

Страница 22: ...in outdoor situations A manual control OUTDOOR series is available specifically designed for outdoor use Please contact your Yunca Agent for details This warranty is void if the recommended service sc...

Страница 23: ...y Date Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email dunedin yunca co nz Web www yunca co nz Cut along here MANUFACTURER COPY This section must be returned with...

Отзывы: