installing the honeYWell 
fan/liMit control

1.   After  attaching  the  warm  air  sheet  metal  plenum  to  the 

furnace, using the fan/limit control white mounting flange 
as  a  template,  place  it  on  the  top  edge  of  the  furnace 
casing above the fire door so that the holes in the furnace 
casing and the flange are aligned with each other. Attach 
the screws to secure the flange. (See Fig. 7)

2.   Using  the  flange  as  a  template,  mark  the  center  of  the 

large hole and the two smaller holes, remove the bracket 
and drill a 7/8" hole and two 1/8" holes in the sheet metal 
plenum.

3.  Replace  the  flange  and  reattach  it  with  the  mounting 

screws.

4.   Mount the fan/limit control ridged bracket (furnished with 

the fan/limit control) with two 1/2 x 7 sheet metal screws.

5.  Insert the fan/limit control into the bracket. Align so that it 

is straight. Tighten setscrew to secure control.

electric Wiring

All electrical wiring must be done in accordance with the National 
Electrical  Code  and  the  code  in  effect  in  your  area. The  electric 
power  supply  to  the  furnace  must  be  through  a  circuit  protector 
device  switch  located  near  the  furnace.  Use  No.14  or  heavier 
wire in circuit. All furnaces covered by this manual operate on 115 
Volts, 60 Cycle, 1-Phase Alternating Current with a 15 amp Circuit 
Protector device.

Warning

Turn off electric power at circuit protector device before making 
any line voltage connections.

Wiring the furnace

On the front of the furnace, next to the wood feed door, is the end 
of the wiring harness coming from the blower motor. Remove the 
lock-nut on the cable connector and place the 4" square box the 
furnished  wiring  harness  over  cable  connector  and  replace  the 
lock-nut.  Secure  the  square  box  to  the  furnace  with  two  sheet 
metal screws.

Connect  the  34"  long  conduit  to  the  fan/limit  switch  previously 
mounted in the warm air plenum.

Connect the main power supply to the 4" square box. This must be 
through a 15 amp circuit protector device. No lighter than No.14 
wire may be used in the furnace electric power supply circuit. Wire 
blower motor, fan/limit and transformer per Fig. 9 page 14.

caution

This furnace is not approved for use with aluminum wire.

ash Pan handles

Install ash pan handle as follows:

1.  Remove pull handle, 10- 24 x 2" screws from plastic bag.
2. Insert 2 No.10 -24 x 2" screws through pull handle into thread-

ed holes on ash pan and tighten.

3. Remove tapered handle from plastic bag and screw to steel 

handle.

Mounting the therMostat

The thermostat must be mounted on an interior centrally located 
wall away from direct sunlight and drafts and approximately 5 feet 
above the floor.

1.  Run 2 conductor thermostat wire (4 wire if you intend to add air 

conditioning)  from  the  damper  control  unit  to  the  thermostat. 
Leveling of the thermostat is not necessary as it is digital.

2.  Connect the wires as outlined on page 14.

installing air conditioning coil

The coil should always be installed in the warm air plenum. The 
metal  condensate  pan  should  be  at  least  2  inches  above  the 
fan limit control probe so that the heated air flow direction is not 
changed.  The  air  flow  needed  for  gravity  operation  in  the  event 
of an electric power or furnace fan failure must not be restricted. 
It is recommended that you install manual dampers along side of 
the condensate pan that can be manually removed or opened for 
winter operation.

Содержание Klondike Eagle IV

Страница 1: ...pliance Alpha American Co 10 Industrial Blvd Palisade MN 56469 www yukon eagle com YUKON EAGLE OWNER S MANUAL Assembly Installation Operation Repair Parts Model No LW 000 Series CAUTION Read Rules And...

Страница 2: ...d during operation Do not operate with flue draft exceeding 03 W C Do not store flammable materials within marked installa tion clearances Frequently inspect and clean heat exchanger smoke pipe and ch...

Страница 3: ...8 Duct Work and Blower Speed Adjustment 18 Testing Installations for Efficiency 18 Test Procedure 10 MAINTENANCE Cleaning the Chimney Smoke Pipe and Heat Exchanger 19 In Case of Chimney Fire 19 Servic...

Страница 4: ...lt in failure of heat exchanger and cause dangerous operation 4 You must have a sufficient supply of combustion air to the area in which the furnace is located page 4 5 Factory Built Chimneys Connect...

Страница 5: ...should occur be sure ash door and firedoor are closed Turn thermostat down to close primary air damper In the event of an electrical power failure be sure ash door and fire door remain closed In the...

Страница 6: ...eat with second baffle making sure baffles interlock as shown in Fig 6 When properly installed baffles will not move more than 1 4 in any direction Failure to have baffles properly installed will seve...

Страница 7: ...pre selected location making sure it is level Proceed as follows Before Installing check DRAW COLLAR Attach the draw collar around the smoke pipe and tight against the furnace cabinet so room air cann...

Страница 8: ...r and place the 4 square box the furnished wiring harness over cable connector and replace the lock nut Secure the square box to the furnace with two sheet metal screws Connect the 34 long conduit to...

Страница 9: ......

Страница 10: ...ent outward into the collar and thus make a better joint WHEN FINISHED THE OPENING INTO THE FLUE MUST BE EQUAL IN SIZE TO THE COLLAR OF THE DRAFT CONTROL If flue pipe is made of material too heavy to...

Страница 11: ...stible wall is allowed if the space is insulated according to NFPA 90B table 6 5 1 2 DO NOT CONNECT THIS FURNACE TO A CHIMNEY SERVING ANOTHER APPLIANCE The chimney should be no less than 8 inches insi...

Страница 12: ...r chimney must terminate at least 2 feet above the peak of the roof Adding more chimney height sometimes cures the problem See Fig 12 page 14 5 Home located on side of hill When the wind blows over a...

Страница 13: ...You need two grilles each with 180 square inches of free opening Metal grilles have about 60 free open area so you need two metal grilles with 300 square inches each of louvered area The height should...

Страница 14: ...chim ney Outside air is also needed to replace any air expelled by kitchen or bathroom fans as well as water heater chimneys or fans Failure to provide outside air to the area in which the furnace is...

Страница 15: ...verload your furnace with wood Failure or damage to the firebox could result Never allow the hot coals to build up above the lower firebricks BEST WOOD TO BURN All solid fuel whether it is coal pine o...

Страница 16: ...ople and is recommended for use in this furnace Anthracite coal is hard and burns like the charcoal that is used in your barbecue grill The coals must touch each other to ignite Therefore the smaller...

Страница 17: ...e ash pan on a daily basis and should never be allowed to accumulate high enough to come in contact with the grates Such a condition could cut off necessary air circulation and could also result in a...

Страница 18: ...R CONDITIONING See air circulating fan performance curve charts on page 21 Service factors for factory furnished motors are 1 3 HP 1 35 1 2 HP 1 25 3 4 HP 1 15 All motors are Class A with Class B insu...

Страница 19: ...ainer until all cinders have thoroughly cooled CLEANING THE CHIMNEY SMOKE PIPE AND HEAT EXCHANGER Avoid chimney fires On a regular schedule check for creosote and soot buildup in the chimney smoke pip...

Страница 20: ...ht Check for obstruction such as loose mortar bird nests and squirrel nests Clean chimney to eliminate obstructions Check for obstructions in combustion air inlet See page 14 Too cold a chimney will c...

Страница 21: ...21...

Страница 22: ...22 9 10100700 10100700 lower upper...

Страница 23: ...23...

Страница 24: ...24 T 8000...

Страница 25: ...______________________________________________________________ _____________________________________________________________________________________ Notes _____________________________________________...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...TRACTOR ONLINE AT OUR WEBSITE OR FROM OUR FACTORY PHONE 1 800 358 0060 FAX 1 800 440 1994 E MAIL yukon mlecmn net WEBSITE www yukon eagle com Alpha American Co 10 Industrial Blvd Palisade MN 56469 www...

Отзывы: