York YPC Скачать руководство пользователя страница 20

20

JOHNSON CONTROLS

FORM 155.19-EG3 (1011)

GENERAL

Provide YORK  Millennium YPC Two-Stage Absorption 

Steam-Fired Chiller(s) capable of producing chilled water 

per the capacities shown on drawings and sched ules.

Each chiller shall be of hermetic design, leak tested, and 

factory performance tested.

Chiller shall ship as a one-piece assembly ready for con

-

nection to the building water, fuel, and electrical systems. 

Purge  pump,  chilled-water  flow  switch,  LiBr  solution, 

deionized water (refrigerant), and steam valve shall be 

shipped loosed for filed installation.

Chiller to ship with a nitrogen gas holding charge to elimi

-

nate the possibility of air entering unit during transport and 

to permit the verification of a leak-tight unit upon delivery.

Purchase price to include parts and labor warranty for a 

period of one year from start up or eighteen months from 

delivery, whichever occurs first.

CONSTRUCTION

The chiller-heater unit to consist of one first-stage (high 

temperature) generator, solution heat exchangers, and 

main shell. The main shell shall include the condenser, 

second-stage  (low  temperature)  generator,  evaporator, 

and absorber.

Crossover routing cooling water from the absorber to the 

condenser shall be shipped loose from the factory, elimi-

nating the need for a customer supplied crossover pipe.

The flow of solution shall be initiated by a hermetic solution 

pump, located beneath the absorber, and shall be divided 

into two parallel paths, one leading to the first-stage gen

-

erator and the other to the second-stage generator. This 

parallel flow design shall permit each stream of solution 

to be concentrated only once in order to limit the maxi

-

mum concentration of LiBr and thus minimize the risk of 

crystallization.

TUBE MATERIALS

The  first-stage  generator  tubes  shall  be  70/30  cupro-

nickel, 0.035 inch (0.89 mm) wall thickness and shall be 

“U -shaped” to minimize thermal stress, prolong tube life, 

and increase unit efficiency. The drain cooler tubes shall 

be  90/10  cupro-nickel,  .030”  (0.76 mm)  wall  thickness. 

The second-stage generator evaporator, absorber, and 

condenser shall be seamless copper 5/8” (15.875 mm), 

OD, 0.025” (0.635 mm) wall, copper tubing for the 14SC, 

and 3/4” (19.05 mm) OD, 0.028” (0.71 mm) wall for the 

16SL and larger, with enhanced surface as required to 

meet given capacity.

WATER BOXES

Water boxes shall be removable to permit tube cleaning 

and replacement. Water-circuit tubing to be replaceable 

from either end of the chiller-heater unit. Stubout water 

connections  having ANSI/AWWA  C-606  grooves  shall 

be provided as standard (ANSI flanged connections are 

optional).  All water boxes and associated water-circuit 

nozzles and tube bundles shall be designed for 150 PSIG 

(1MPa)  working  pressure  and  shall  be  hydrostatically 

tested to 195 PSIG (1.3 MPa).  Vent and drain connec

-

tions shall be provided on each water box.

SIGHT GLASSES

Unit shall be equipped with no fewer than six (6) sight 

glasses to permit exact adjustment of solution and refrig

-

erant levels under full load conditions to ensure efficient 

and trouble free operation. Sight glasses to be located as 

follows:  upper  evaporator,  lower  evaporator,  first-stage 

generator, second-stage generator, ab sorber, oil trap.

SPRAY DISTRIBUTION

Solution and refrigerant distribution shall be accom plished 

by use of a drip apparatus which produces a fine, laminar 

film on the outside of the tube bundles.

PUMPS

Solution  and  refrigerant  pumps  shall  be  hermetically  

sealed,  self  lubricating,  totally  enclosed,  liquid-cooled, 

factory-mounted, wired and tested. Suction and dis charge 

connections of solution and refrigerant pumps shall be 

welded to chiller-heater unit piping. Flanged pump con

-

nections are not acceptable. Pumps shall be designed for 

a total of 55,000 hours between service inspections.

ISOLATION VALVES

Suction and discharge connections for the solution and 

refrigerant pumps shall be equipped with factory welded 

isolation valves to permit the servicing of hermetic pump 

assemblies without any loss of solution or leakage of air 

into the chiller-heater.

SOLUTION VALVES

Valves  used  for  adjusting  solution  flow  shall  be  fully 

welded or brazed to prevent leakage of air into unit. Valve 

operator shall be covered with a seal cap to eliminate the 

possibility of stem leakage. Fittings be tween valve body 

and unit piping to be welded. Threaded valve connections 

are not acceptable.

PURGING SYSTEM

Chiller-heater  shall  be  equipped  with  a  purge  system 

which  will  constantly  remove  noncondensible  vapors 

Guide Specifications

Содержание YPC

Страница 1: ...FORM 155 19 EG3 1011 Model YPC Two Stage Steam Fired Absorption Chiller Style D Models YPC ST 14SC through YPC ST 19S 300 through 675 Tons 1050 through 2372 kW ...

Страница 2: ...M 155 19 EG3 1011 1 Introduction 3 How It Works 4 Ratings 5 MicroComputer Control Center 6 Mechanical Specifications 8 Optional Features 11 Application Data 12 Dimensions 17 Nozzle Arrangement 14SC 18 Nozzle Arrangement 16SL and Larger 19 Guide Specifications 20 ...

Страница 3: ...ximately 1 19 With today s energy and environmental considerations the YORK YPC Two Stage Steam Absorption Chiller is the ideal choice for a wide range of applications YPC Steam Chillers come equipped with the same sophisticated microprocessor controls found throughout Johnson Controls line of large tonnage chillers making the YPC Steam Chiller the smart est and most efficient absorber on the mark...

Страница 4: ...ates the possibility of crystallization solidification by allowing the unit to operate at much lower solution concentration and temperatures than series flow systems 2 First stage Generator An outside steam source heats dilute LiBr 58 3 coming from the Solution Pump Heat Exchangers This produces hot refrigerant vapor which is sent to the Second Stage Generator leaving a concentrated solution 63 8 ...

Страница 5: ...rough a metering valve and flows down to the Refrigerant Pump where it is pumped up the the top of the Evaporator Here the liquid is sprayed out as a fine mist over the Evapora tor tubes Due to the extreme vacuum 6 mm Hg in the Evaporator some of the refrigerant liquid evaporator creating the refrigerant effect This vacuum is created by hygroscopic action the strong affinity LiBr has for water in ...

Страница 6: ...down and the operational parameters just prior to shutdown For a complete history printout of the last four shut downs and operational parameters just prior to shut down CAPACITY CONTROL When automatic capacity control is desired the Micro Computer Control Center automatically varies the steam flow rate to maintain the programmed leaving chilled water set point for cooling loads ranging from 20 to...

Страница 7: ...ety Shutdown systems discussed in this section Also included is an operator interface concentration calculator When in the PROGRAM mode an operator can use the concentration calculator to determine concentration by inputting set of conditions The operator must input any two of three parameters bromide solution temperature saturation temperature and pressure and the micropanel will display the conc...

Страница 8: ...ell closer to the generator contains the intermediate pressure section of the machine consist ing of the condenser and second stage generator The second stage generator is a drip type heat exchanger with 5 8 16 mm 0 025 0 6 mm wall copper tubing for the 14SC and 3 4 19 mm OD 0 028 0 7 mm wall for the 16SL and larger Generator and condenser are separated by baffling which prevents liquid carryover ...

Страница 9: ... use of a eductor Noncondensibles are then stored in a purge chamber until they can be removed through the use of a purge pump The purge pump is an oil rotary two stage vacuum pump with a 1 4 HP 3 Phase ODP motor The chiller control panel includes a SmartPurge system that will automatically sense the amount of non conden sibles in the purge chamber and empty the tank whenever necessary The SmartPu...

Страница 10: ... Security access code is provided for operator to pro gram setpoints or to choose local remote or service modes of operation Manual control of the steam valve position and all pumps is provided through separate buttons in the service mode of operation Data Logging All operating and setpoint information can be transmitted to a remote printer by others through the RS232 port in the control center to...

Страница 11: ... and includes the following Water flow rates and temperatures Steam consumption rate System operating temperatures and pressures Absorber solution concentrations All liquid levels in the sightglasses Exact solution and refrigerant charge amount SPARE PUMPS A complete set of replacement solution and refrigerant pumps ships alongside the unit for local spare parts inventory REMOTE RESET CONTROLS Two...

Страница 12: ...imen tation or organic growth These will hurt chiller perform ance and increase operating and maintenance costs Normally performance may be maintained by corrective water treat ment and periodic cleaning of tubes If water conditions exist which cannot be corrected by proper water treatment it may be necessary to provide a larger allowance for foul ing and or specify special material of constructio...

Страница 13: ...nstalled in the tower water piping in the same manner as the chilled water flow switch above The YPC chiller is engineered for maximum effi ciency at both design and part load operation by taking advantage of the colder cooling tower water tempera tures which naturally occur in the winter months In its standard con figuration YPC absorbers can toler ate entering tower water temperatures as low as ...

Страница 14: ...he Johnson Controls supplied steam control valve must be no further than 200 inches 5 m from the first stage generator steam inlet flange in order to minimize the pressure drop from the valve exit to the generator inlet Dimension H1 is specified to prevent condensate back flow from the generator into the steam piping Dimen sion H2 is specified to prevent excessive backpressure to the drain cooler ...

Страница 15: ...rain cooler at approximately 15 PSIG 1 bar 180 F 82 2 C 4 Maximum inlet steam pressure 128 PSIG 8 83 bar 5 Automatic shutoff valve to be failsafe type 6 Both the steam supply and condensate drain pipes must be prop erly sized and pitched to prevent hammering 7 Steam control valve to be installed within 200 inches 5 m of the first stage generator steam inlet flange spray header pump and one refrige...

Страница 16: ...0V 125A 250V 36 8 12 12 1 7 5 67 5 15 5 28 230 3PH 60Hz 75 8 100A 240V 100A 250V 36 8 12 12 1 5 4 3 66 6 15 5 50 380V 3PH 50Hz 41 3 60A 480V 60A 600V 19 7 7 0 9 2 6 36 5 16 2 46 460V 3PH 60Hz 38 60A 480V 50A 600V 18 4 6 6 0 8 2 2 33 4 15 5 19S 17 200 208V 3PH 60Hz 94 7 200A 240V 125A 250V 36 8 30 12 1 7 5 85 5 20 1 28 230 3PH 60Hz 93 8 100A 240V 125A 250V 36 8 30 12 1 5 4 3 84 6 20 1 50 380V 3PH 5...

Страница 17: ...ION AREAS LBS NO CHARGE LBS SHIPPED W CHARGE INLET PIPE IN OUTLET PIPE IN 14SC 201 74 88 20900 22500 24300 2 5 3 4 16SL 235 89 103 30200 34150 37800 4 0 3 4 172 398 17S 235 89 103 31000 34950 38600 4 0 3 4 172 398 18S 274 90 109 36900 41600 45800 4 0 3 4 205 474 19S 314 90 109 44500 49600 54900 4 0 3 4 237 506 UNIT TYPE LENGTH1 mm A WIDTH mm B HEIGHT mm C RIGGING WEIGHT OPERATING WEIGHT kg STEAM2 ...

Страница 18: ... Victualic couplings Factory installed class 150 ANSI B16 5 round slip on forged carbon steel with 1 16 raised face water flanged nozzles are optional Companion flanges nuts bolts and gaskets are not furnished 3 Connected piping should allow for removal of compact water box for tube access and cleaning 4 Tower water must enter the absorber first for proper performance EVAPORATOR NOZZLE ARRANGEMENT...

Страница 19: ...langes or the use of ANSI AWWA C 606 couplings Factory installed class 150 ANSI B16 5 round slip on forged carbon steel with 1 16 inch raised face water flanged nozzles are optional Companion flanges nuts bolts and gaskets are not furnished 3 Connected piping should allow for removal of compact water box for tube access and cleaning 4 Tower water must enter the absorber first for proper performanc...

Страница 20: ... tubing for the 14SC and 3 4 19 05mm OD 0 028 0 71mm wall for the 16SL and larger with enhanced surface as required to meet given capacity WATER BOXES Water boxes shall be removable to permit tube cleaning and replacement Water circuit tubing to be replaceable from either end of the chiller heater unit Stubout water connections having ANSI AWWA C 606 grooves shall be provided as standard ANSI flan...

Страница 21: ...to be sized by the unit manu facturer in accordance with the specified steam pressure and flow requirements The steam valve shall be a cage type valve incorporat ing a carbon steel body and a teflon seat Valve link age actua tor motor assembly shall be capable of modu lating steam flow in a linear fashion from 20 to 100 of maximum design chiller steam input Valve shall be equipped with 150 lb ANSI...

Страница 22: ...automatic restart is displayed manual restart is implied all system operating information dis played just prior to shutdown Warning Conditions MicroComputer Control Center Panel shall close warning contacts and generate a unique warning message whenever one of the following operating conditions is detected Low refrigerant temperature High generator temperature or pressure High or low entering cond...

Страница 23: ...f all operating setpoint and shutdown informa tion to a remote printer printer supplied by others This transmission can occur as needed or automatically on predetermined intervals 0 1 to 25 5 hrs In the case of a safety or cycling shutdown the RS 232 port shall transmit all operating data detected prior to the shut down as well as the time and cause of the shutdown to a remote printer printer supp...

Страница 24: ... Form 155 19 EG3 1011 Supersedes 155 19 EG3 311 ...