![York YEFB Series Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/york/yefb-series/yefb-series_installation-and-operation-manual_3583516030.webp)
30
1
2
3
4
5
6
7
8
9
10
6.3 PREPARATION FOR THE INSTALLATION
Before installing it is necessary to mount the fixing supports. Open the accessories box and
take out the 4 brackets and relevant screws. Place the brackets on the 4 holes and fix them
with the screws (Fig. 4). Fix the electric box with the screws (Fig. 4a).
6.3.1 ANTI-VIBRATION MOUNTS
The use of anti-vibration mounts and M8 threaded rods is suggested during installation
phase, as shown in the picture.
LEGEND
1. Anti-vibration
2.
Threated rod
3.
Fixing support
6.3.2 MOUNTING THE YEFB UNIT
After having completed the phase «Preparation for installation», the unit has to be turned
upside down on its pallet.
For the ceiling mounting of the unit, use a forklift in order to assure correct and safe
positioning during the fixing operations.
Enclosure 2 shows the dimensions for the fixing and connection of the unit to the system.
+
Fig. 4
Fig. 4a
Содержание YEFB Series
Страница 2: ...2 2...
Страница 92: ...92 1 2 3 4 5 6 7 8 9 10 YEFB 020 030 CBL00 EV YEFB 020 030 CBL00 EV PC...
Страница 93: ...93 1 2 3 4 5 6 7 8 9 10 YEFB 020 030 CBL00 EVC EVH YEFB 040 070 CBL20 EV IT EN DE FR...
Страница 94: ...94 1 2 3 4 5 6 7 8 9 10 CBL20 EVC EVH CBL20 EVC EVH PC...
Страница 95: ...95...