JOHNSON CONTROLS
34
FORM 160.00-O2
ISSUE DATE: 04/30/2019
SECTION 7 – START-UP INSTRUCTIONS
Fill Procedure
1. Fill the coolant reservoir with YORK Coolant un-
til the level is 1/2 inch from the top of the coolant
reservoir.
2. Remove J2, J3, J4 connectors and allow the cool-
ant pump to run for a period of 5 minutes. Top off
the level of the coolant.
3. Verify that the level of the coolant is within ¼
inch from the top of the coolant reservoir. If the
coolant level is low, then add more YORK cool-
ant.
4. Run the coolant pump for 10 minutes. Verify that
the level of the coolant is proper. If the coolant
level is low, then add more YORK coolant, and
repeat this step.
5. Verify that all of the air has been worked out of
the coolant. If not, continue to run the coolant
pump, and add YORK coolant as required.
6. Reinstall the J2, J3, J4 connectors.
7.
Wrap the plastic pipe plug with Teflon tape, and
install on the coolant reservoir. Be sure to hold the
coolant reservoir when installing the pipe plug.
Содержание SSS 14L-B
Страница 4: ...JOHNSON CONTROLS 4 FORM 160 00 O2 ISSUE DATE 04 30 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...JOHNSON CONTROLS 8 FORM 160 00 O2 ISSUE DATE 04 30 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...JOHNSON CONTROLS 24 FORM 160 00 O2 ISSUE DATE 04 30 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...JOHNSON CONTROLS 30 FORM 160 00 O2 ISSUE DATE 04 30 2019 THIS PAGE INTENTIONALLY LEFT BLANK...