
5
aSSemBLy InStrUCtIonS
gEtting StartED
Place all parts from the box in a cleared area and position them on the floor in front of you. Remove all packing materials
from your area and place them back into the box. Do not dispose of the packing materials until assembly is completed.
Read each step carefully before beginning. If you are missing a part, please contact our technical support.
After unpacking the unit, open the hardware bag and make sure that you have all the following items. Some hardware may
be already attached to the part.
harDWarE iDEntification chart
This chart is provided to help identify the hardware used in the assembly process. Place the washers, the end of the bolts,
or screws on the circles to check for the correct diameter. Use the small scale to check the length of the bolts and screws.
note: the length of all bolts and screws except those with flat heads is measured from below the head to the end of the
bolt or screw. flat head bolts and screws are measured from the top of the head to the end of the bolt or screw.
Part No. 60 x 2
45MM CARRIAGE BOLT
Part No. 35 x 10
FLAT WASHER
Part No. 12 x 2
NYLOCK NUT
Part No. 11 x 2
PLASTIC BOLT CAP
Part No. 47 x 6
20MM ALLEN HEAD BOLT
Part No. 9 x 2
SPRING WASHER
Part No. 48 x 1
HAND WHEEL KNOB
Part No. 49 x 1
LARGE FLAT WASHER
Part No. 51 x 2
55MM CARRIAGE BOLT
Part No. 36 x 2
NYLOCK CAP NUT
Part No. 33 x 4
PLASTIC SPACER
tooLS
Содержание Diamond R301 Rower
Страница 1: ...W W W Y O R K F I T N E S S C O M O W N E R S G U I D E 07 30 2009 Diamond R301 Rower...
Страница 20: ...20 EXPLODED DRAWING...
Страница 21: ...21 EXPLODED DRAWING...
Страница 22: ...22 NOTE NOTE...
Страница 23: ...23 NOTE NOTE...
Страница 24: ...2009 YORK BARBELL...