STT113 TOWER CRANE OPERATION AND SERVICE MANUAL
6B
-
9
1. Brake engaged
E
E
1. Brake engaged
3. Working principle
Note: “E” is the clearance of brake, which value must be kept between 0.8-1.2mm.
Adjust it if necessary.
2. Electric starting of weather vane device
Description: It is an electromagnetic brake, which is braked when switched off. It has
independent power supply.
Working principle
2. Brake released
2
. Brake released