![Yongmao STT113 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/yongmao/stt113/stt113_operation-and-service-manual_912135029.webp)
STT113 TOWER CRANE OPERATION AND SERVICE MANUAL
4B 1
Brance
electrical
control
panel
Chapter IV Power supply and schematic diagram
I. Power supply of the tower crane
1. Power supply
Install the electrical equipment of tower crane according to the national standard
requirement. ST series tower crane meet the relevant regulations in design and
manufacture, the management regulation of power use in job site and the
requirements of TN-S three-phase five-wire system or TT three-phase four-phase
system power supply. The job site power supply must meet the national constructin
department requirements, the power use requirement “third class distribution and two
class protection”. The following system diagram for your reference:
380V 50HZ
TN-S
子
子
子
子
TN-S TN-S
or TT orTT or TT
Note
:
①
Both the branch electrical control panel and branch switch box are equipped with
air switches and leakage protector.
②
The operating parameter of leakage protector in branch switch box is:
270mA, 0.1S.
③
The user can select the installation method of TN-S or TT according to the local
supply network administrative regulations.
④
All the devices before A box (including cable) should be prepared by user.
Connection mode of power supply entering into A box
TN
—
—
—
—
S TT
The tower crane must be earthed properly, no matter which mode of power
supply is adopted.
Jib site
main
electrical
control
panel
Branch
electrical
control
panel
Branch
switch
box
A box
L1 L2 L3 PE N
L1 L2 L3 PE
A, B, C, PE, N
A, B, C, PE
A box
A box