![Yolink YS4909-UC Скачать руководство пользователя страница 44](http://html2.mh-extra.com/html/yolink/ys4909-uc/ys4909-uc_manual_3451041044.webp)
G-3. Install or Replace the Ba eries of Gas/Water Valve Controller
With a li ing/prying ac on on the two clamp latches, open the cover on the controller (due to the
rainproof design, this step may be slightly difficult)
Install
new
, and then close the
four
AA ba eries
alkaline non-rechargeable
two clamps of the
controller
Using the app, check the online status of the controller and verify there is no low-ba ery indicator
Reconnect the
controller with the manipulator
O
the cover
pen
Install four new AA ba eries
Close the cover
4 x AA
1. Do not press the SET bu on during the en re ba ery installa on or replacement process
2. Do not mix old and new ba eries
41