2. Get Ready
Turn the ball valve to OPEN status
(keep the center axis of ball valve
aligned to the water pipe)
1
Loosen the two screws on the two
handle
-
suppor ng
bolts
2
L o o s e n t h e b ra c ket s i nto t wo
separate parts (carefully place the
two bolts aside)
3
10