5.2 Position of Process Flanges for Launch and Detect Units:
Process flanges should be located on the process such that the Launch and Detect Units can be installed,
accessed and removed in a safe and convenient manner.
The following criteria/Check List should be met at a minimum:
• Good, Safe Engineering practices
• Local codes and regulations for such equipment installation
• Appropriate hazardous area (if applicable) precautions
• Owner Company best practice and engineering standards
• Access for personnel to stand in front of launch and Detect Units
• Clearance for installation and removal of Launch and Detect (see below)
• Clearance for installation and removal of purge insertion tubes (if applicable)
• Access to process isolation valves
• Safe routing for interconnecting cables
• Ambient conditions in accordance with analyzer limits
• Access to appropriate utilities
• Adjacent space for mounting to Calibration Cell when off-line
TDLS200 TDL Analyzer Instruction Manual V2.1
Page 40 of 131
-
0
4
-
3.2 Position of Process Flanges for Launch and Detect Units:
Process flanges should be located on the process such that the Launch and Detect Units can be
installed, accessed removed in a safe and convenient manner.
The following criteria/Check List should be met at a minimum:
•
Good, Safe Engineering practices
•
Local codes and regulations for such equipment installation
•
Appropriate hazardous area (if applicable) precautions
•
Owner Company best practice and engineering standards
•
Access for personnel to stand in front of launch and Detect Units
•
Clearance for installation and removal of Launch and Detect (see below)
•
Clearance for installation and removal of purge insertion tubes (if applicable)
•
Access to process isolation valves
•
Safe routing for interconnecting cables
•
Ambient conditions in accordance with analyzer limits
•
Access to appropriate utilities
•
Adjacent space for mounting to Calibration Cell when off-line
Figure 22 - and Detect Unit – In-Situ Installation Overview
Figure 23 - Launch and Detect Unit – In-Situ with Insertion Purge Tube Installation Overview
Figure 23 - Launch and Detect Unit-In -Situ Installation Overview
Figure 24 - Launch and Detect Unit-In-Situ with Insertion Purge Tube Installation Overview