Commissioning
Quick Reference Instruction Manual for Spare
Sensor replacement
IM01U10A01-00EN-R, 1
st
edition, 2019-12-09
27 / 76
6.5 Commissioning
1. Activate external power switch.
2. Perform check of piping installation.
3. Check flow meter for device errors, warnings or alarms,
see chapter on
4. Configure the transmitter, and perform autozero,
see chapter on
System configuration and operation [
.
ð
Flow meter is ready for operation.