background image

Warranty :

EMI Emmisssion Certification:

1 Year

return

 

 to factory Warranty on Electric Drive components, sensors and Downloading support hardware.

Please ensure you agree to the warrantry conditions before proceeding to purchase this product, read the warranty form 
at the end of this user guide.  Installation wiring to sensors and wear and tear on connectors not covered

 
NOTE:

  

  

  

  

  

  

 

The

 
We

 

question.

 

smallest

 

the

 

even

 

have

 

you

 

if

 

'Anytime'

upport 

s

 

dealer

 

your

 

Call

 

help.

 

to

 

here

 

are

 

 

system.

 

the

 

by

 

released

 

being

 

is

 

amounts

 

correct

 

the

 

ensure

 

to

  

  

  

  

  

  

 

  

  

system

 

metering

 

the

 

on

 

bag

 

a

 

ith

w

 

runs

 

test

 

drill

 

needed

 

if

 

and

 

system

 

the

 

understand

 

should

 

operator

 

 

issue.

 

out

 

with

 

operating

 

is

 

it

 

ensure

 

to

 

system

 

the

 

monitor

  

  

  

  

  

  

 

  

  

  

  

  

 

to

 

and

 

correctly

 

up

 

system

 

drive

 

Electric

 

the

 

set

 

 

dealer

 

to

or

 

operator

 

the

 

of

 

responsibilty

 

sole

 

the

 

is

 t

  

  

  

  

  

  

 

I

  

product.

 

this

 

using

 

from

 

result

  

  

  

  

  

  

 

 

that

 

irregularities

 

planting

 

mishaps,

 

any

 

for

 

responsible

 

or

 

liable

 

way

 

no

 

in

 

is

 

Limited

 

Zealand

 

New

 

Gtech

 

 

.

Electro magnetic interference emmission certification are a series of tests that required to be passed beforean
electronic device can be sold. These test are related to how much electron magnetic radiation is emmitted by
an electronic device.

The Area meter has the following certifications and is suitable for sale in the following countries:
     Certification

Countries

     C-Tick Z874 Class B

New Zealand, Australia

 

Europe

     

CE

3

 

Содержание Field Mate 3

Страница 1: ...Volumetric Displacement ontrol C System Fertilizer Users Guide and Installation Manual 1...

Страница 2: ...part be copied photocopied reproduced stored or reduced to any electronic medium or machine readable form without permisssion from G Tech NZ Ltd If you Need to Call Customer Service Please complete th...

Страница 3: ...l needed if and system the understand should operator issue out with operating is it ensure to system the monitor to and correctly up system drive Electric the set dealer to or operator the of respons...

Страница 4: ...onitoring Hardware fault monitors on all motor channels Real time motor RPM displayed to give real world proformance measurment ott he users Fast drill calibration Instant feed back on system operatio...

Страница 5: ...Hold signal Switch to GND to trigger 3 Pump Paint Distance Green GPS Sync Pulse Switch to GND to trigger 2 Brown 7 Red 4 Blue Pump Supply Solenoid solenoid Gnd P wer o power Power 8 rive D Brown Green...

Страница 6: ...Sync pulse spacing Current distance travelled from sync pulse State machine status Relects fert release function control Ground speed system voltage plant counter The fert distance counts down here p...

Страница 7: ...R key Inside the JOB menu Change the job Hold ARROW key to select Bin1 libary select Currently set to 1 Bin2 libary select Currently set to 1 Move to new job if required Current JOB To reset or view d...

Страница 8: ...AREA drilled for this job This total can be cleared by holding down any ARROW key If reset no other totals are effected Speed of the drill in KM HR NOTE get this number right so the true speed of teh...

Страница 9: ...Inside the OPERATE menu More Working RATE of the Drill Displayed in Hectare Hour 15...

Страница 10: ...for ever Speed sensor pulse Working width of the drill Quick Press the POWER key to enter the SETUP mode NOTE When exiting SETUP turn the monitor OFF then ON If not done CYCLE POWER will flash and the...

Страница 11: ...REPORT menu Move through the REPORT screens using the ARROW keys Quick Press Quick Press the POWER key to enter the REPORT mode Name of BIN1 Name of BIN2 Name of BIN3 Name of BIN4 Name of this monitor...

Страница 12: ...T menu More Time with the drill in RUN mode and Drilling Time with the drill in RUN mode and stationary Time with the drill in HOLD Mode with the drill moving Time with the drill in HOLD Mode the dril...

Страница 13: ...ze of the DISTANCE PULSE number used to calc the area for this job Size of the DRILL WIDTH number used to calc the area for this job Number of Speed pulses counted while drilling Number of speed pulse...

Страница 14: ...FO menu Move through the INFO screens using the ARROW keys Quick Press Quick Press the POWER key to enter the INFO screen LOGO 24 HELP Direct International use 0064211535759 callers Zealand New in wit...

Страница 15: ...rate drilling of rate drill educed R status sensor bin ow L number Serial monitor into voltage Battery units easurement M temperature Monitor These counter on off Power metrics proformance system or...

Страница 16: ...ore menu O INF the Real Run support Time support calculation Area Status Hold status Clock Time Buzzer numbers support Area Total calculation AREA the for numbers ground Back status Rate Reduction fea...

Отзывы: