![YOKOGAWA ADMAG AM100D Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/yokogawa/admag-am100d/admag-am100d_user-manual_911180012.webp)
IM 1E6D0-01E
3-7
3. INSTALLATION
(3) Positioning Flow Tube
Please pass two through-bolts to adjacent holes of both
flanges and mount the Flow Tube, and pass other
through-bolts to other holes. (Refer to Figure 3.3.2/
3.3.3) In case stud type of through-bolts are used,
position them coming in contact centering devices with
thread of bolts.
(4) Tightening Nuts
Please tighten the bolts according to Torque Values in
Table 3.3.3. In case of PVC piping, please select
optional code /FRG, use rubber gasket and tighten with
the torque value in Table 3.3.4.
Nuts
Through-bolts (four)
Gasket (two)
Mini-flange
Centering devices (two)
Flange
Please use appropriate bolts and
nuts according to process
connection.
Nuts (eight)
Horizontal Mounting
Vertical Mounting
F030302.EPS
Figure 3.3.2
Mounting Procedure (Size: 2.5 mm(0.1") to 15 mm(0.5"))
Nuts (eight)
Through-bolts (four)
Centering devices (two)
Gasket (two)
Flange
Please use appropriate
bolts and nuts according
to process connection.
Mini-flange
Horizontal Mounting
Vertical Mounting
F030303.EPS
Figure 3.3.3
Mounting Procedure (Size: 25 mm(1"), 40 mm(1.5"))
CAUTION
In case of PFA lining type, as the lining material
is Fluorocarbon PFA, it is possible that nuts may
loose by its character as time passes. Please
tighten the nuts regularly.
Please be sure to tighten the bolts following
prescribed torque values. Please tighten the
flange bolts diagonally with the same torque
values, step by step up to the prescribed torque
value.