background image

 

 

YMC Europe GmbH 

Operation 

YMC Pilot 

29 / 49 

 

Low pressure chromatography column 

6.4.1 

Slurry preparation 

 

 

 CAREFUL 

 

 

Formation of dust with dry packing material 

Lung irritation possible if packing material is inhaled.  

►  Read the material safety data sheet from the packing material manufacturer. 

►  Wear a dusk mask. 

 

 

 

 

The use of a more dilute liquid slurry simplifies the column packing. The 

total  column  volume  of  the  slurry  should  not  exceed  the  maximum 
volume of the column. 

 

 

 

 

The  removal  of  fines  decreases  the  column  back  pressure  and  so 
improves the performance of the packed column. 

 

 

  The slurry is prepared as follows:  

1.  Mix the solvent or buffer  with the  appropriate amount of packing material  in  a 

suitable container (see manufacturer´s recommendations).  

  The  total  volume  of  the  slurry  must  be  less  than  the  maximum  column 

volume.  

  The amount of packing material determines the final bed length.  

2.  Mix  the  slurry  with  a  stirring  rod  until  the  slurry  is  homogenous  and  avoid 

introduction of air bubbles. 

3.  Check  if  the  material  is  suitable  for  ultrasonication  (see  manufacturer´s 

recommendations).  

  If the material is suitable for ultrasonication, degas the slurry in an ultrasonic 

bath.  

  If the material is not suitable for ultrasonication, let the material settle.  

4.  Let the degassed slurry settle.  

5.  If fines are visible on the surface of the slurry, remove them.  

 

 

Содержание Pilot

Страница 1: ...YMC Pilot In order to avoid personal injuries and damage to equipment please read this manual carefully and act on the recommendations given Keep this manual accessible for the user at all times Vers...

Страница 2: ...YMC Europe GmbH Sch ttmannshof 19 46539 Dinslaken Deutschland 49 02064 427 0 Info ymc de www ymc de YMC Europe GmbH YMC Pilot 2 49 Low pressure chromatography column...

Страница 3: ...Adjustable end piece 15 3 4 2 Piston front 18 3 4 3 Fixed end piece 19 3 4 4 Column body 21 4 Delivery 22 4 1 Delivery contents 22 4 2 Delivery inspection 22 5 Requirements for operation 23 5 1 Safet...

Страница 4: ...eplacement 40 7 4 2 O ring plunger replacement 40 7 4 3 Replacing the glass body 41 8 Troubleshooting 42 9 Storage packaging and transport 44 9 1 Storage 44 9 2 Transport 44 10 Disposal 45 11 Appendix...

Страница 5: ...oured signal word fields Always read the full text of the warning in order to effectively protect yourself from damage The following signal word fields are marked by different colours and signal words...

Страница 6: ...of the action step to check whether the step has been performed correctly 2 Another action step Figures within instructions A figure is only related to the action step which is listed directly below t...

Страница 7: ...tmospheric pressure at the intended maximum temperature 40 C Every use which is outside these specifications is defined as not intended use The intended use includes the compliance with the advice and...

Страница 8: ...ended personal protective equipment The following protective equipment is required Symbol PPE Phase of life Action Protective gloves Operation Column packing Column unpacking Initiation Cleaning Safet...

Страница 9: ...epending on the column version 3 2 Specifications PED fluid group Group 1 referred to EU Guideline 2014 68 EU PED safety requirement Article 4 3 of EU Guideline 2014 68 EU Available versions AB versio...

Страница 10: ...65x55 45x42 48x44 60x50 65x55 Maximum co lumn height mm 1750 1750 1800 1920 2100 2100 2150 2270 1depending on packing material and packing method 3 2 2 Specifications SR version Length glass body mm...

Страница 11: ...ical resistance of the column can be concluded Such statements are based on our current technical knowledge and experiences as well as on existing literature and the information from the commodity pro...

Страница 12: ...loromethane Good Limited Good Unstab le Unstab le Good Limited 0 1 M EDTA 3 Good Good Good Good Good Good Good 1 M Acetic acid 6 Good Good Good Good Good Good Good Ethanol Good Good Good Good Good Goo...

Страница 13: ...phosphate Good Good Limited Good Good Cyclohexane Good Good Good Good Good Dichloromethane Good Good Good Good Good 0 1 M EDTA 3 Good Good Good Good Good 1 M Acetic acid 6 Good Good Limited Good Good...

Страница 14: ...l parts listed for the column body and the end pieces are in the appendix The glass column consists of the adjustable end piece 1 the column body 2 the fixed end piece 3 and the column stand The colum...

Страница 15: ...piece the internal and external spindle the plunger the frit and the O ring The tubing passes through the internal spindle to the plunger With the handle bar in the closing disc the piston can be adj...

Страница 16: ...tersunk screw 3 Set screw 17 Frit 4 Tension nut 18 O ring frit 5 Teflon disc 19 Handle bar 6 Set screw 20 Cylinder screw 7 Connection nut outer spindle 21 Internal spindle AEP 8 Adapter rotary handle...

Страница 17: ...liding disc small 6 Coupler plunger 23 Sliding disc big 7 Distributor plate 24 Threaded insert eye bolts 8 O ring coupler 25 Eye bolt 9 Pressure piece 26 Connection nut outer spindle 10 Sealing washer...

Страница 18: ...4 O ring frit The piston front design is the same for the adjustable and the fixed end pieces The piston front consists of the plunger 3 and the pressure piece 1 which is located on springs on the plu...

Страница 19: ...By turning the tension nut the O ring is compressed or relaxed and this way the seal is tightened or loosened The closing disc FEP is connected with the column disc FEP via cylinder screws 3 4 3 1 Fi...

Страница 20: ...EP 14 Cylinder screw 3 Tension nut 15 Threaded insert 4 Connection nut inner spindle 16 Coupler plunger 5 Set screw 17 Sealing washer 6 Tubing 18 O ring coupler 7 Teflon disc 19 Distributor plate 8 Cy...

Страница 21: ...Rod 5 Main pillar 3 Glass body 6 Castor The glass body is fixed between the column disc AEP and the column disc FEP by the rods The column body is equipped with wheels The two end pieces can be insert...

Страница 22: ...lity Control If ordered especially separately Material certificates statements of conformity 4 2 Delivery inspection YMC recommends retaining and storing the original packaging and the foam cushion so...

Страница 23: ...lumn only with pressures within the stated specifications Otherwise there is a risk of injury and material damage CAREFUL The temperature range which is used must not exceed fall below the given speci...

Страница 24: ...ring work on the glass column wear the prescribed personal protective equipment WARNING Glass column under high pressure Eye or skin injuries possible due to remaining pressure in the tubing or in the...

Страница 25: ...bottom up 4 When the column is filled with liquid completely close gate valve 3 5 Build up the testing pressure with a flow rate of 25 50 mL min The testing pressure is the pressure limit of the colum...

Страница 26: ...he direction of the external spindle or the connection nut outer spindle The O ring is squeezed O ring is sealed when a constant black line appears in the glass body The O ring is loosened as follows...

Страница 27: ...s 1 Turn the adjustable end piece in up direction as far as it will go 2 Loosen the O ring of the adjustable end piece by turning the tension nut in up direction 3 Remove the cylinder screws from the...

Страница 28: ...packing method to the manufacturer s packing material information Improper packing conditions can cause damage or completely destroy the material ATTENTION Avoid the use of a magnetic stirrer Dependin...

Страница 29: ...mn The slurry is prepared as follows 1 Mix the solvent or buffer with the appropriate amount of packing material in a suitable container see manufacturer s recommendations The total volume of the slur...

Страница 30: ...with the O ring is guaranteed 12 Fill the glass column up to the edge of the column body with slurry solvent 13 Loosen the O ring of the adjustable end piece 14 Insert the adjustable end piece with lo...

Страница 31: ...r until 2 3 cm above the frit in the fixed end piece bottom up This ensures that no air is trapped under or inside the frit 6 Close the valve in the tubing of the fixed end piece 7 Pour the homogenous...

Страница 32: ...sed Consider the manufacturer s recommendations for the packing material The flow rate should be considerably 20 higher than the required operating flow rate The column bed is visually compressed 24 C...

Страница 33: ...asher 4 Threaded insert 11 Cylinder screw 5 Nut 12 Coupling disc 6 Column disc AEP 13 O ring glass body 7 Rod The packing adapter is assembled as follows 1 Remove the adjustable end piece Chapter 6 3...

Страница 34: ...ment CAREFUL Packing material Eye and skin injuries possible through contact with packing material Wear the prescribed personal protective equipment The glass column is unpacked under flow as follows...

Страница 35: ...perating pressure Only authorised and qualified personnel should carry out the maintenance WARNING Incorrect replacement of spare parts Severe injuries due to breakage possible if unauthorised spare p...

Страница 36: ...the contamination three different procedures can be used 1 Regeneration 2 Sterilisation 3 Depyrogenation Regeneration Regeneration removes inorganic and organic contamination which binds to the chroma...

Страница 37: ...ents lipopolysaccharides and other lipophilic substances Very good Good 7 2 Cleaning and maintenance plan The specified maintenance plan here is to be regarded as a general recommendation Depending on...

Страница 38: ...pment CAREFUL Packing material Eye and skin injuries possible through contact with packing material Wear the prescribed personal protective equipment Devices required Wetted and lint free rags Collect...

Страница 39: ...r wall of the column body 4 Clean the column body with an authorised cleaning agent and a wetted lint free rag 5 Put a collection vessel below the column body 6 Connect the pump to the tubing from the...

Страница 40: ...ghten on the opposite sites Take care during assembly of the glass body that all parts are correctly aligned 7 4 1 Frit replacement The frits in the adjustable and fixed end pieces are replaced as fol...

Страница 41: ...te sites 3 Remove the cap nuts and washers 4 Remove the column disc from the column body Remove the O ring glass body 5 Remove the glass body carefully 6 Position the new glass body on the O ring glas...

Страница 42: ...Stressed column packing Peak shape of the eluted substances deteriorates Dead volume at the column inlet See fault description Dead volume occurred Partially clogged frit Frit replacement Chapter 7 4...

Страница 43: ...eck if solvent leaks between glass body and O ring 2 Check contact surface of the glass body and the sealing surface for impurities 3 Check the torque and the concentric arrangement of the parts Tubin...

Страница 44: ...ld be stored as follows unpacked cleaned dry empty 9 2 Transport We recommend the use of the original wooden box for transportation If you are no longer in possession of the box please pack the column...

Страница 45: ...sposal YMC Pilot 45 49 Low pressure chromatography column 10 Disposal For the disposal of the glass column it has to be disassembled and disposed according to the national and other applicable environ...

Страница 46: ...PI140 500 Glass body Borosilicate glass 3 33 4 140 PI140 850 Glass body Borosilicate glass 3 3 5 200 PI200 500 Glass body Borosilicate glass 3 3 6 200 PI200 850 Glass body Borosilicate glass 3 3 7 300...

Страница 47: ...mm Countersunk screw frit PEEK 5 100 PI100AB115PE 10 Frit PE 6 100 PI100AB102E O ring frit EPDM 7 100 140 200 300 PI034 AB Connector PVDF PEEK PTFE 8 100 140 200 300 PI034 DS Sealing washer connector...

Страница 48: ...5 100 PI100SR110SS 10 Frit Stainless steel 1 4404 6 100 PI100SR102K O ring frit Kalrez 7 100 140 200 300 PI034 SR Connector Stainless steel 1 4404 8 100 140 200 300 PI034 DS Sealing washer connector...

Страница 49: ...lass body replacement 41 P Packaging 44 Packing 28 Packing adapter 33 Personal protective equipment 8 Pressure test 24 Protective equipment 8 R Resistance chemical 11 S Signal word 5 Signal word field...

Отзывы: