SMARTBENCH V1.0
Unit 1 Westfield Court | Barns Ground | Clevedon | Bristol | BS21 6FQ | UK
Tel No: +44 1275 390721 | Email: [email protected]
16
Set X/Y datum (start point for the job)
The X/Y datum refers to the point at which the job will start. This is set by moving the
cutter to the intended point, and telling EasyCut when you are happy with the position.
Go to Move Screen (1)
Move the X Axis (2)
Move the Y axis (3)
Set the job start point (1)
Содержание SMARTBENCH
Страница 1: ...Quick Start Guide v1 2...