RIGGING AND MOVING 
 

The  Yazaki  chiller  is  designed  for 

overhead rigging with lifting lugs provided 
from the factory. 

When  rigging  for  overhead  lift,  attach 

shackle bolts to the lifting lugs.  Bring the 
four  individual  rigging  cables 

(each 

40”  or 

1m  minimum) 

together  at  a  point  high 

enough  that  the  angle  between  the 
rigging  line  and  the  top  of  the  unit  is  no 
less  than  60°,  as  shown  in  the  drawing 
below. 

 

 

Figure 4 

– Rigging 

 

 

Clearance 

Inches

(mm)

 

A - Vertical 

88

 (2235)

 

B - Passageway 

55

 (1400)

 

C - Into Corner 

55 

(1400)

 

D - Out of Corner 

55

 (1400)

 

Table 3 

– Hallway Clearances 

There  are  times  when  the  unit  simply 

cannot  be  moved  to  the  final  installation 
site  while  remaining  in  the  vertical 
position.    It  is  be  permissible  to  lay  the 
unit  on  its  side,  so  long  as  the  proper 
precautions and guidelines are followed. 
 

1. Transport by vehicle ONLY with the 

unit 

in 

vertical 

configuration.

  

THERE 

IS 

NO 

ALTERNATIVE.

  

Transport  by  vehicle  over  roadway 
while  the  unit  is  not  in  the  vertical 
configuration will void the warranty. 

2. 

The  unit  may  ONLY  lay  over  onto  its 
back  -  the  side  with  the  water 
connections.    It  may  NOT  lay  over  on 
any other side! 

a. 

While on its back, the water piping acts 
as  legs  to  support  the  internal  tubing 
bundles.  On any other side, the tubing 
bundles  will  not  be  properly  supported 
and  may  shift  or  become  severely 
damaged, 

rendering 

the 

machine 

inoperable. 

3. 

Do not simply tip the unit over onto its 
back.  It should be lifted and turned to 
the  horizontal  configuration  while  fully 
supported  and  suspended,  though  it 
only  need  be  1” 

(25mm)

  or  so  off  the 

ground while turning. 

4. 

DO  NOT  lay  the  unit  directly  onto  the 
ground in a manner in which the water 
connections  support  the  weight  of  the 
unit.    Attach  4x4  blocks  or  timbers  to 
the frame for  support  in  the horizontal 
configuration.  

5. 

DO 

NOT 

USE 

SINGLE 

POINT 

LIFTING  when  laying  the  unit  onto  its 
side.  At least THREE lifting points will 
be necessary.   

 

Содержание AROACE

Страница 1: ...hot water from a process cogeneration solar or other waste heat source capable of providing a temperature range of 158 203 F 70 95 C CONTENTS GENERAL Page GENERAL 2 MODEL DESIGNATION 2 STANDARD SPECI...

Страница 2: ...check the installation and supervise or conduct the initial startup and operation of the unit CAUTION THE YAZAKI WARRANTY WILL BE VOIDED IF THE FOLLOWING RESTRICTIONS ARE NOT OBSERVED 1 DO NOT OPEN AN...

Страница 3: ...liters 9 8 37 Heat Medium Heat Input Mbtu hr kW hr 85 7 25 1 Temperature Inlet F C 190 4 88 Outlet F C 181 4 83 Range F C 158 203 70 95 Generator Pressure Loss PSI kPa 11 2 77 0 Maximum Operating Pre...

Страница 4: ...4 EQUIPMENT DIMENSIONS Figure 1 Equipment Dimensions...

Страница 5: ...5 INTERNAL WIRING DIAGRAM Figure 2 Internal Wiring Diagram...

Страница 6: ...AUX2 is closed Not Used P1 Chilled Water Pump ON signal Supplied by the chiller P1D Chilled Water Pump Operation Input Pump overloads P2 Cooling Water Pump ON signal Supplied by the chiller P2D Coolin...

Страница 7: ...al configuration THERE IS NO ALTERNATIVE Transport by vehicle over roadway while the unit is not in the vertical configuration will void the warranty 2 The unit may ONLY lay over onto its back the sid...

Страница 8: ...the horizontal configuration let it gently rest on the blocks that were attached during step 2 8 Once the unit is to be turned back to the vertical configuration it is preferable that the unit again b...

Страница 9: ...make certain the concrete base and the soil beneath are sufficient for the task Settling over time could cause the unit to become unlevel which could have a negative impact on the performance and lif...

Страница 10: ...ach fluid circuit connection to facilitate startup future service and routine maintenance Strainers in each circuit particularly the cooling water circuit are recommended as well These should be place...

Страница 11: ...installed between the machine and the balance stop valves so as to allow for flushing of the absorber condenser coils should it ever become necessary CAUTION 1 DO NOT EXCEED 100 120 OF STANDARD COOLI...

Страница 12: ...thod in the USA is the use of glycol in the fluid loop Glycol may be permitted for use in Yazaki chiller with certain restrictions and observations 1 Do not use automotive glycol Antifreeze since it c...

Страница 13: ...e are two power supply boards in the Control Box that will take voltage within this range and supply proper output voltage One power supply generates 24vdc to power the Solution Pump and provide 24 vo...

Страница 14: ...s CaCO3 ppm 50 150 50 50 Ionic silica SiO2 ppm 30 50 30 30 Reference Total iron Fe ppm 1 0 1 0 1 0 0 3 Copper Cu ppm 1 0 0 3 1 0 0 1 Sulfide ion S 2 ppm ND ND ND ND Ammonium ion NH4 ppm 1 0 1 0 0 1 0...

Страница 15: ...tank properly charged installed on heat medium piping 13 Water make up and fill lines installed to the cooling tower 14 Pressure relief valves set to maximum of 85 3 psig 588 kPa installed on piping...

Страница 16: ...EMS INC 701 E PLANO PKWY SUITE 305 PLANO TEXAS 75074 6700 Phone 469 229 5443 Fax 469 229 5448 Email yazaki yazakienergy com Web www yazakienergy com This symbol on the product s nameplate means it is...

Отзывы: