GENERAL 

 
This  equipment  should  only  be 

installed 

by 

trained 

and 

qualified 

personnel 

who 

are 

familiar 

with 

absorption  chillers.    All  precautions  in 
these instructions as well as on tags and 
labels  attached  to  the  unit  must  be 
observed  to  ensure  the  safety  of 
personnel  and  to  maintain  warranty 
validation. 

 
Each  Yazaki  absorption  chiller  has 

been  evacuated,  charged  with  lithium 
bromide  and  water  solution,  and  run 
tested prior to leaving the factory. 

 
Piping  connections  are  all  located  at 

the rear of the unit. 

 
After 

the 

equipment 

has 

been 

installed,  a  Yazaki  Authorized  Service 
Provider 

(ASP)

 

must 

check 

the 

installation and  supervise  or  conduct  the 
initial startup and operation of the unit. 

 

 

CAUTION 

 

THE  YAZAKI  WARRANTY  WILL  BE 
VOIDED 

IF 

THE 

FOLLOWING 

RESTRICTIONS ARE NOT OBSERVED: 

 

1.  DO  NOT  OPEN  ANY  SERVICE  VALVES 

WITHOUT 

PROPER 

EVACUATION 

ASSEMBLY ATTACHED TO THEM AS SUCH 
ACTION  WILL  RESULT  IN  LOSS  OF 
VACUUM  AND  INTRODUCTION  OF  GASES 
TO  THE  INTERIOR  OF  THE  MACHINE 
WHICH COULD CAUSE CORROSION. 

2.  ALWAYS  HANDLE  THE  EQUIPMENT  WITH 

CARE 

AND 

MAINTAIN 

IN 

NEAR-

VERTICAL POSITION DURING RIGGING.  IF 
THE 

EQUIPMENT 

MUST 

BE 

TILTED, 

CAREFULLY 

FOLLOW 

INSTRUCTIONS 

PROVIDED WITHIN THIS DOCUMENT. 

3.  DO  NOT  ATTEMPT  TO  START  THE 

SYSTEM WITHOUT SUPERVISION FROM A 
YAZAKI AUTHORIZED SERVICE PROVIDER 

(ASP)

 

 
 

 

MODEL DESIGNATION 

 

   WFC-S    C     5 

 
Water-Fired Chiller  
 
Cooling Only Design 

 

Cooling Capacity:  5 rated tons 

 
 
 
 
 
 

Содержание AROACE

Страница 1: ...hot water from a process cogeneration solar or other waste heat source capable of providing a temperature range of 158 203 F 70 95 C CONTENTS GENERAL Page GENERAL 2 MODEL DESIGNATION 2 STANDARD SPECI...

Страница 2: ...check the installation and supervise or conduct the initial startup and operation of the unit CAUTION THE YAZAKI WARRANTY WILL BE VOIDED IF THE FOLLOWING RESTRICTIONS ARE NOT OBSERVED 1 DO NOT OPEN AN...

Страница 3: ...liters 9 8 37 Heat Medium Heat Input Mbtu hr kW hr 85 7 25 1 Temperature Inlet F C 190 4 88 Outlet F C 181 4 83 Range F C 158 203 70 95 Generator Pressure Loss PSI kPa 11 2 77 0 Maximum Operating Pre...

Страница 4: ...4 EQUIPMENT DIMENSIONS Figure 1 Equipment Dimensions...

Страница 5: ...5 INTERNAL WIRING DIAGRAM Figure 2 Internal Wiring Diagram...

Страница 6: ...AUX2 is closed Not Used P1 Chilled Water Pump ON signal Supplied by the chiller P1D Chilled Water Pump Operation Input Pump overloads P2 Cooling Water Pump ON signal Supplied by the chiller P2D Coolin...

Страница 7: ...al configuration THERE IS NO ALTERNATIVE Transport by vehicle over roadway while the unit is not in the vertical configuration will void the warranty 2 The unit may ONLY lay over onto its back the sid...

Страница 8: ...the horizontal configuration let it gently rest on the blocks that were attached during step 2 8 Once the unit is to be turned back to the vertical configuration it is preferable that the unit again b...

Страница 9: ...make certain the concrete base and the soil beneath are sufficient for the task Settling over time could cause the unit to become unlevel which could have a negative impact on the performance and lif...

Страница 10: ...ach fluid circuit connection to facilitate startup future service and routine maintenance Strainers in each circuit particularly the cooling water circuit are recommended as well These should be place...

Страница 11: ...installed between the machine and the balance stop valves so as to allow for flushing of the absorber condenser coils should it ever become necessary CAUTION 1 DO NOT EXCEED 100 120 OF STANDARD COOLI...

Страница 12: ...thod in the USA is the use of glycol in the fluid loop Glycol may be permitted for use in Yazaki chiller with certain restrictions and observations 1 Do not use automotive glycol Antifreeze since it c...

Страница 13: ...e are two power supply boards in the Control Box that will take voltage within this range and supply proper output voltage One power supply generates 24vdc to power the Solution Pump and provide 24 vo...

Страница 14: ...s CaCO3 ppm 50 150 50 50 Ionic silica SiO2 ppm 30 50 30 30 Reference Total iron Fe ppm 1 0 1 0 1 0 0 3 Copper Cu ppm 1 0 0 3 1 0 0 1 Sulfide ion S 2 ppm ND ND ND ND Ammonium ion NH4 ppm 1 0 1 0 0 1 0...

Страница 15: ...tank properly charged installed on heat medium piping 13 Water make up and fill lines installed to the cooling tower 14 Pressure relief valves set to maximum of 85 3 psig 588 kPa installed on piping...

Страница 16: ...EMS INC 701 E PLANO PKWY SUITE 305 PLANO TEXAS 75074 6700 Phone 469 229 5443 Fax 469 229 5448 Email yazaki yazakienergy com Web www yazakienergy com This symbol on the product s nameplate means it is...