4 Option Components
16
YASKAWA
TOEP YEACOM 06A V1000 Option PROFINET SI-EP3/V Installation Manual
■
Power-Up Diagnostics
An LED test is performed each time the drive is powered up. The initial boot sequence may
take several seconds. After the LEDs have completed the diagnostic LED sequence, the
option is successfully initialized. The LEDs then assume operational conditions as shown in
Table 4 Power-Up Diagnostic LED Sequence
Sequence
Module Status (MS)
Network Status (NS)
Time (ms)
1
Green
OFF
250
2
Red
OFF
250
3
Green
OFF
-
4
Green
Green
250
5
Green
Red
250
6
Green
OFF
-