2 Installation and Wiring
E-16
2
Installation and Wiring
Refer to the following manual for details on installing and wiring the prod-
uct.
Machine Controller MP3000 Series MP3100 Product Manual
(Manual No.: SIEP C880725 24)
3
Inspections
Perform inspections according to the information that is provided in this
section.
3.1 Daily Inspections
The daily inspection items are given in the following table.
Inspection Item
Description
Criteria
Correction
Connection
conditions
Connectors
Connectors must not be loose.
Tighten the
lock screws
on the con-
nectors.
Indi-
cators
S1
indicator
Make sure
the indica-
tor is lit.
The indicator must be lit green.
(If it is not lit, the Controller is
being initialized. If it is lit red or
flashing red, there is an error.)
Refer to the
relevant
manual.
*
S2
indicator
Make sure
the indica-
tor is lit.
The indicator must be lit green.
(If it is not lit, the user program
is stopped. If it is lit red or
flashing red, there is an error.)
M-ALM
indicator
Make sure
the indica-
tor is not lit.
The indicator must not be lit. (If
it is lit, there is an axis alarm.)
CN
indicator
Make sure
the indica-
tor is lit.
The indicator must be lit green.
(If it is not lit,
MECHATROLINK-III communi-
cations are not established.)
LK1
indicator
Make sure
the indica-
tor is lit.
The indicator must be lit yel-
low. (It is lit while
MECHATROLINK-III communi-
cations are active on port 1.)
LK2
indicator
Make sure
the indica-
tor is lit.
The indicator must be lit yel-
low. (It is lit while
MECHATROLINK-III communi-
cations are active on port 2.)