28
H:
Make sure each corner is square and level then attach one (1469) Gusset FB Right and (1470) Gusset
FB Left to each Front Beam and Post Assembly with two 5/16 x 4” Hex Bolt (with 5/16” fl at washer, 5/16” Lock
Washer, 5/16” T-Nut). Pre-drill with a 1/8” drill bit and attach two 5/16 x 3” Lag Screw (with 1/4-5/16” large washer)
as shown below. F5.10, F5.11 and F5.12)
Make sure assembly is square.
I:
Depending on what you are placing the Pavilion on will determine how you anchor it to that surface. Please
refer to pages 6 and 7 for installation examples.
Any hardware or extra
materials for mounting will have to
be purchased in advance.
Hardware
8 x 5/16 x 3” Lag Screw (1/4-5/16” large washer)
8 x 5/16 x 4” Hex Bolt (5/16” fl at washer, 5/16” lock washer,
5/16” T-Nut)
5/16 x 3”
Lag Screw
F5.10 - Inside View
Step 5: Frame Assembly and Anchoring
Part 4
Front Beam
Assembly
5/16” Flat Washer
1/4-5/16”
Large Washer
F5.11
(1469) Gusset FB Right
(1469) Gusset FB
Right
5/16 x 4” Hex
Bolt
(1470) Gusset FB Left
(1470) Gusset
FB Left
Note: The bevelled ends on each
gusset should always face away from
the wood it is attaching to.
5/16” T-Nut
5/16” Lock
Washer
F5.12
2 x (1469) Gusset FB Right
2 x (1470) Gusset FB Left
Wood Parts
Содержание YM12904
Страница 3: ...3 support yardistrystructures com ...
Страница 8: ...8 support yardistrystructures com ...
Страница 9: ...9 support yardistrystructures com ...
Страница 10: ...10 support yardistrystructures com ...
Страница 11: ...11 support yardistrystructures com ...
Страница 12: ...12 support yardistrystructures com Y70841 610 Y00441 611 Y70841 607 Y00441 612 ...
Страница 27: ......
Страница 56: ...56 support yardistrystructures com ...
Страница 57: ...57 support yardistrystructures com NOTES ...