background image

 12 

[email protected]

A:

  In between two (579) Rail T/Bs place three (580) Ballusters.  The two outside (580) Ballusters should measure 

3” from the edge of each (579) Rail T/B.  The middle (580) Balluster should be evenly spaced between the first 

two. Pre-drill with a 1/8” drill bit then attach all three (580) Ballusters to both Rail T/Bs with two #10 x 4” Wood 

Screws per balluster.  (fig. 2.1)

B:

  Repeat Step A seven more times to make eight Balluster Assemblies.

Step 2:  Post Panel Assemblies 

Part 1  

Hardware

Wood Parts

Fig. 2.1

Evenly 

Spaced

16 x (579) Rail T/B 
24 x (580) Balluster 

48  x  #10 x 4” Wood Screw

(579) Rail T/B

#10 x 4” 

Wood Screw

#10 x 4” 

Wood Screw

(580) 

Balluster

3”

3”

(579) Rail T/B

(580) 

Balluster

Содержание MADISON YM11783X

Страница 1: ...10 16 2018 HEIGHT 8 2 or 2 44m Height 8 2 2 44 m IMPORTANT RETAIN FOR FUTURE REFERENCE READ CAREFULLY 10 x 14 Charleston Pergola 14 0 10 0 Yardistry North America Toll Free Customer Support 1 888 509...

Страница 2: ...pit or chimnea for safe distances from combustible materials Wear gloves to avoid injury from possible sharp edges of individual elements before assembly During installation follow all safety warnings...

Страница 3: ...roduct and is a requirement of the warranty This warranty does not cover any inspection costs This Limited Warranty does not cover Labour for replacment of any defective item s Incidental or consequen...

Страница 4: ...if required WOOD PARTS Applying a water repellent or stain water based on a yearly basis is important maintenance to maintain maximum life and performance of the product Check all wood members for det...

Страница 5: ...u are mounting to concrete footers see below for the correct locations and placement Please double check for possibility of any underground utilities such as gas telephone cable or sprinkler lines Fol...

Страница 6: ...included Anchoring Hardware not included Concrete Patio min 13 x 9 with 6 clearance on all sides Wood Deck min 13 x 9 with 6 clearance on all sides Panel Post Corner Panel Post Corner Post Panel Post...

Страница 7: ...133 4 x 2295 5mm 5 8 x 5 1 4 x 90 3 8 Long Bar Top Y50132 513 2 512 31 8 x 69 9 x 406 5mm 1 x 2 x 16 Side Joist Y50132 512 3 501 15 9 x 85 7 x 1384 3mm 5 8 x 3 3 8 x 54 1 2 Front Back Shelf Y50132 501...

Страница 8: ...x 857 2mm 1 3 8 x 2 x 33 Short Trellis D Y50132 497 2 495 34 9 x 82 6 x 857 2mm 1 3 8 x 3 x 33 Short Trellis C Y50132 495 1 499 15 9 x 133 4 x 381mm 5 8 x 5 x 15 Plaque Y50132 499 Dimensions are appr...

Страница 9: ...3 Lock Washer 16 5 16 Y05318 300 8 Hex Bolt 1 4 x 5 Y07718 250 T Nut 16 5 16 Y08518 300 Lock Nut 43 1 4 Y08318 203 16 1 4 Y08518 200 T Nut 96pc Wood Screw 8 x 1 1 2 Y06091 512 32pc Wood Screw 8 x 2 Y0...

Страница 10: ...approximate and are shown to assist in the identification of parts for assembly Actual dimensions may be Hardware Identification 1 2 x 2 Y00400 005 Robertson Driver 1 8 Y00400 002 Drill Bit 1 Y70829...

Страница 11: ...ting any holes D Before you discard your cartons fill out the form below The carton I D stamp is located on the end of each carton Please retain this information for future reference You will need thi...

Страница 12: ...t two Pre drill with a 1 8 drill bit then attach all three 580 Ballusters to both Rail T Bs with two 10 x 4 Wood Screws per balluster fig 2 1 B Repeat Step A seven more times to make eight Balluster A...

Страница 13: ...2 3 and 2 4 D From the top of each 528 Panel Post and 527 Corner Panel Post measure 14 down then place one 581 Top Horizontal with the bottom at the 14 mark Attach 581 Top Horizontal to both posts wi...

Страница 14: ...es Part 1 Hardware A On each Post Panel Assembly install one Room L Mount flush to the inside bottom of 528 Panel Post with one 10 x 1 1 4 Pan Screw fig 3 1 and 3 2 Fig 3 1 8 x 10 x 1 1 4 Pan Screw Ro...

Страница 15: ...ngle using a 1 8 drill bit then attach 527 Corner Panel Posts to 190 Corner Posts with two 8 x 2 1 2 Wood Screws per Corner Post Assembly fig 3 3 and 3 4 E Repeat Steps B D to create four Corner Post...

Страница 16: ...3 5 8 x 10 x 2 1 2 Pan Screw Room L Mount 10 x 2 1 2 Pan Screw Fig 3 6 Components 8 x Room L Mount Flush 527 Corner Panel Post 527 Corner Panel Post 528 Panel Post 190 Corner Post 190 Corner Post F Pl...

Страница 17: ...2 at measured location on the side with the cut out make sure it is square then attach with three 10 x 4 Wood Screws Repeat for a fourth Beam End Assembly fig 4 2 There should be two Beam End Assembl...

Страница 18: ...f the boards then attach with four 8 x 1 1 2 Wood Screws fig 5 5 4 x 489 Front Beam 4 x 026 Splice 1 x 499 Plaque Hardware Wood Parts 8 x 5 16 x 3 Lag Screw 5 16 flat washer 8 x 5 16 x 1 1 2 Hex Bolt...

Страница 19: ...fig 6 1 Each shorter end should measure 8 from 190 Corner Post to 190 Corner Post and 4 6 1 2 from 528 Panel Post to 528 Panel Post fig 6 2 Each longer end should measure 12 from 190 Corner Post to 19...

Страница 20: ...nd 1 4 t nut 485 Beam End 10 1 2 faces out fig 7 1 and 7 2 B Repeat Step A for the second Corner Post Assembly on the same side 485 Beam End 10 1 2 faces out fig 7 1 and 7 2 C With a helper place one...

Страница 21: ...t with 1 4 lock washer 5 16 flat washer and 1 4 t nut per post fig 7 3 and 7 4 H Make sure Front Beam Assembly is level then attach to Corner Post Assemblies with six 8 x 2 1 2 Wood Screws fig 7 3 and...

Страница 22: ...ing down 52 from the end of one beam then using a 1 8 drill bit pre drill a hole using the countersunk holes as a guide and attach with two 5 16 x 3 Lag Screws with 5 16 flat washer and four 8 x 3 Woo...

Страница 23: ...Panel Post Attach Beam Assemblies to 067 Beam 20 3 4 with six 10 x 4 Wood Screws per 067 Beam 20 3 4 fig 9 1 and 9 3 C Attach each 528 Panel Post on the short and long side to 067 Beam 20 3 4 and Inn...

Страница 24: ...and bottom of 581 Top Horizontal Attach gusset to 486 Beam 57 1 2 with two 8 x 2 1 2 Wood Screws and to 528 Panel Post with one 8 x 3 Wood Screw Repeat for the left hand side with one 484 Arch Gusset...

Страница 25: ...he front of 528 Panel Post and bottom of 581 Top Horizontal Attach gusset to Front Beam Assembly with two 8 x 2 1 2 Wood Screws and to 528 Panel Post with one 8 x 3 Wood Screw Repeat for the left hand...

Страница 26: ...Inner Beam Assembly place one 483 Arch Gusset Right on the right hand side so the top fits tight to Inner Beam Assembly and the bottom fits tight to the side and flush to the front of 528 Panel Post...

Страница 27: ...B with four 492 Short Trellis B and four 493 Long Trellis B to create four Trellis B Assemblies fig 11 1 and 11 2 Hardware 5 x 1 4 x 1 3 4 Hex Bolt 5 16 flat washer x 2 1 4 lock nut 20 x 1 4 x 1 3 4...

Страница 28: ...Assembly will be placed in the order and staggered when attaching to the Pergola as shown in fig 11 3 495 Short Trellis C 496 Long Trellis D 497 Short Trellis D 494 Long Trellis C 497 Short Trellis D...

Страница 29: ...Trellis Clips with one 10 x 1 1 4 Pan Screw per clip fig 11 6 and 11 7 Hardware 8 x 10 x 1 1 4 Pan Screw Hardware 72 S12 10 x 1 1 4 Pan Screw Trellis Clip Trellis Clip 10 x 1 1 4 Pan Screw 10 x 1 1 4...

Страница 30: ...Bs rests on 026 Splice the remaining Trellis Assemblies rest directly on the Front and Inner Beam Assemblies Hardware 64 x 10 x 1 1 4 Pan Screw PG 15 Trellis Assembly B Front Beam Assembly Trellis Cli...

Страница 31: ...e one 516 Bar Gusset against 528 Panel Post so the top meaures 40 1 8 from the bottom of 528 Panel Post The longer end over hangs the outside of 528 Panel Post by 7 7 8 Make sure gusset is level then...

Страница 32: ...with two 8 x 1 1 2 Wood Screws per joist There will be a 5 8 overhang at the top of 501 Front Back Shelf fig 13 1 C Flush to the bottom of each joist and outside of each 502 Shelf Side Joist attach o...

Страница 33: ...p of both 498 Shelf Gussets so the front of the frame overhangs the gussets by 5 8 Attach each 502 Shelf Side Joist to each 528 Panel Post with three 8 x 2 Wood Screws per joist fig 13 2 13 3 and 13 4...

Страница 34: ...ce two 503 Shelf Tops in between 501 Front Back Shelves so the ends are flush with the outside of each 502 Shelf Side Joist then attach to each 500 Shelf Joist and 502 Shelf Side Joist with eight 8 x...

Страница 35: ...es in the middle of 501 Front Back Shelf flush to the bottom of the board then attach with two 8 x 1 1 2 Wood Screws per joist There will be a 5 8 overhang at the top of 501 Front Back Shelf The dista...

Страница 36: ...by 5 8 Attach each 512 Side Joist to each 528 Panel Post with three 8 x 2 Wood Screws per joist fig 14 2 and 14 3 11 8 X 2 W S sets tice Bar overhangs 5 8 in front of RDWARE tach Bar Frame 5 8 8 x 2...

Страница 37: ...510 Bar Back attach one 509 End Joist to 579 Rail T B with three 8 x 2 1 2 Wood Screws Repeat for the other end of 510 Bar Back fig 14 4 and 14 5 F Attach 510 Bar Back to both 509 End Joists with two...

Страница 38: ...ide Joist with two 8 x 3 Wood Screws per gusset fig 14 6 and 14 7 H Attach both 516 Bar Gussets to each 512 Side Joist with two 8 x 3 Wood Screws per gusset fig 14 6 and 14 7 516 Bar Gusset Fig 14 6 F...

Страница 39: ...e place one 583 Bar Right against 190 Corner Post and 501 Front Back Shelf so the tops are flush and are tight Attach 583 Bar Right to 190 Corner Post with two 8 x 1 1 2 Wood Screws and to 512 Side Jo...

Страница 40: ...e Corner Panel Post then lastly place one 513 Long Bar Top tight to 510 Bar Back Attach each board to joists with twelve 8 x 1 1 2 Wood Screws per board fig 14 10 and 14 11 514 Mid Bar Top Fig 14 11 F...

Страница 41: ...aps fig 15 1 15 2 15 3 and 15 4 Step 15 Attach Canopy Part 1 PG 26 Charleston Canopy Components 1 x Charleston Canopy with hardware Fig 15 1 Fig 15 2 Trellis Assembly A Trellis Assembly A Male Snap Fe...

Страница 42: ...ing female snaps as a guide mark location then install the male snaps along both Beam End Assemblies and 486 Beam 57 1 2 Connect male and female snaps On the other short side repeat this step fig 15 6...

Страница 43: ...ation on your Pergola with two 10 x 1 1 4 Pan Screws This provides warnings concerning safety and important contact information A tracking number is provided to allow you to get critical information o...

Страница 44: ...44 support yardistrystructures com NOTES...

Страница 45: ...45 support yardistrystructures com NOTES...

Страница 46: ...hat Model Name Nombre del Modelo Nom du mod le Model Number from front cover N mero de Modelo de la portada No du mod le page de couverture Comments Comentarios Commentaires Mail To Enviar por Correo...

Отзывы: