Step
5
:
Fasten flange on bracket to 2x6 using two 3" lags. Be
sure inside flange is tight against inside of 2x6.
Pre-drill 7/16" hole through hole on inside flange
and through 2x6.
Step
6
:
Climbing Set Assembly
Fasten ground runner 2x4 to end ladder using two 6
1/8" bolts. Tighten immediately.
Step
8
:
Step
7
:
Finish fastening top ladder to tower using two 2 5/8"
bolts. Tighten immediately.
17