7
You are now ready to complete the install of the floor.
Using the template provided, fasten joist hangers at
proper positions. Fasten white metal joist hanger using
1 3/4" stainless steel washer head screw provided.
Template will show amount of joist hangers that should
be used.
Install joists as shown. Top of joist should be flush with
top of 2x6.
Note: there will be three floor joists.
Installed joists.
Lay out floorboards. Two shorter floorboards go between
posts. Narrow floorboard goes in the center of the floor.
Step 13:
Step 16:
Step 15:
Step 14:
Phobos
Vinyl Playset
Assembly Manual